A 15-foot tall, 34-ton steel cauldron will soon make its way east on Penn Avenue in the Strip District.
The massive vessel, about 100 years old, was used to ladle molten steel through a former Pittsburgh mill. Currently located on the corner of 12th Street and Penn Avenue, it will move a block over to serve as an anchor outside the Sen. John Heinz History Center’s new wing, set to open in 2028 on 13th Street.
The history center, which opened in 1996, will break ground on phase one of its first major expansion since 2004 within the next two weeks, President and CEO Andy Masich said. Once the new building is completed, the cauldron will sit at its entrance, alongside the largest cannon ever cast in the U.S., he said.
“Pittsburgh, after all, was both the arsenal of the Union and the arsenal of democracy,” Mr. Masich said. “These big outdoor objects will help us tell that story.”
The history center’s new, four-story wing will cover about 80,000 square feet and connect to its main building on Smallman Street, as well as its museum support building. The wing will include a new visitor orientation center run by VisitPittsburgh, a 150-seat auditorium, new exhibition spaces, a rooftop terrace and more.
Plans to expand the center’s footprint have been in the works for about eight years, Mr. Masich said. It’s taken about that time for the organization to acquire the necessary property — the history center now owns the entire block of Penn Avenue behind its main building on Smallman Street.
Read More
Last month, the center won city approval to demolish four buildings currently used for museum storage and exhibition preparation to make way for the expansion, at 1243, 1241, 1237 and 1233 Penn Ave.
The buildings, which cover 24,409 square feet and have a combined assessed value of just under $2.5 million, are all more than 75 years old. Demolition will begin within the next two weeks, Mr. Masich said.
“This has been a dream that's been a long time coming, and we're all excited about it,” Mr. Masich said.
Bringing history to the present
The new wing’s first floor, which will free to the public, will contain an expanded cafe and larger great hall for public events, surrounded by historic vehicles, including the first Jeep and first electric car ever manufactured by Westinghouse, Mr. Masich said.
VisitPittsburgh’s new visitor center will also be on the ground floor. It’s set to be open to the public by the end of 2025, in time to welcome visitors attending next year’s NFL Draft, which Pittsburgh will host in April. As part of the expansion plans, the history center also plans to expand its Western Pennsylvania Sports Museum ahead of the draft, Mr. Masich said.
Next to the visitor’s area will be the auditorium for lectures and short films.
Visitors to the upper floors will pay admission. The second floor will house an exhibition on Pittsburgh’s industry and innovation, from 19,000 years ago to the present day and covering the city’s swing from heavy industry to healthcare, tech and robotics.
“We make history fresh daily here in Pittsburgh,” Mr. Masich said. “We want to bring history right up to the present. We want to be relevant to people who are living today.”
On the third floor, the history center is planning a new exhibit on children’s TV icon Fred Rogers, as well as an expanded kids activities area with demonstration kitchens for cooking classes.
The floor will also contain smart classrooms equipped with modern technology and an expanded library section that includes gallery space for the center’s Jewish history program and Pennsylvania art, Mr. Masich said.
The new wing’s top floor will feature an 8,000-square-foot outdoor terrace, which Mr. Masich said will accommodate large events. The history center hosts around 90 weddings a year, as well as bar and bat mitzvahs and corporate events.
“Part of that is because we want people to connect to the History Center, especially when they're making history with their own events and in their own lives,” he said.
Also on the fourth floor, the center is creating a new home for its longstanding African American Collection, which will become a Museum of African American History with exhibits, galleries, office and classroom space. That expansion has been discussed for the last five to six years, Mr. Masich said.
Looking to the future
In 2021, the history center received a $3 million state redevelopment assistance capital grant to aid expansion plans. Center officials are now in the midst of a campaign to raise additional funds and plan to release additional details in the fall, Mr. Masich said.
As for the project’s estimated cost, the history center has not released a final number.
In addition to the new wing, the history center is searching for a developer to eventually build a history-themed hotel on the corner of 12th Street and Penn Avenue.
Each of the hotel’s floors would be themed, with exhibits in the hallways and windows into collections housed in storage vaults, Mr. Masich said.
The former Mahla Furniture building at 1201 Penn Ave. — originally built in the 1890s and currently used for museum storage — would be preserved and incorporated into the plans, he added.
Construction on the new wing is expected to begin after demolition of the old buildings concludes.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.