The northbound Veterans Bridge ramp to Route 28 is scheduled to close for about two weeks starting early Tuesday, PennDOT announced.
The ramp will be closed around the clock starting at 6 a.m. for expansion dam replacement and deck repairs. It is scheduled to reopen May 31.
The posted detour will be for motorists to continue northbound on the Parkway North to the Hazlett Street exit, go right at East Street and left at East Ohio Street to reach Route 28. PennDOT said police will assist with traffic control.
That is but one of a new round of restrictions that start this week in the ongoing $17 million second phase of the Veterans Bridge-Crosstown Boulevard rehabilitation project.
Northbound traffic on the bridge will be limited to two 11-foot-wide lanes starting at 6 a.m. Tuesday, and further squeezed to one lane between 8 p.m. and 10 a.m. daily through May 31.
The Washington Place on-ramp to northbound Interstate 579-Crosstown Boulevard also will close at 6 a.m. and remain closed around-the-clock through May 31.
The posted detour looks like a sightseeing tour: right on Bedford Avenue, right on Crawford Avenue past the old Civic Arena site; right on Centre Avenue; cross over I-579; right on Sixth Avenue; right on Grant Street; right on Liberty Avenue; left at 16th Street and cross bridge; left at East Ohio Street; right at Madison Avenue to reach the Parkway North.
Traffic bound for Route 28 will be directed to turn right at East Ohio to reach the on-ramp.
Short-term lane closures are possible until 3 p.m. today on the Bedford Avenue bridge over I-579 and a long-term lane shift was set for today on the ramp from southbound I-579 to the Liberty Bridge.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.