Astrobotic’s Peregrine mission is no longer headed to the moon, but continues to make history.

After a herculean effort Monday to steer its first lunar lander back toward the sun, the mission control team in Pittsburgh began to prioritize certain onboard gadgets that could still gather data while Peregrine hurtled through space.

NASA said it was performing “payload assessments” on its five instruments, four of which are expected to fly on future flights, while a team of Carnegie Mellon University students waited through the night hoping for a chance to make contact with their lunar rover, Iris.

That hourlong window eventually came around 4 a.m. Tuesday, and the Iris team, split between its mission control at CMU and a vacation rental in Cape Canaveral, raced to glean all they could.

Advertise with us

“The hour proved unambiguously that Iris was operational,” said Red Whittaker, the CMU robotics professor overseeing the team. “The communications, the command, the thermal system, the computing, the electronics — everything worked as intended such that had it reached the moon, it would have at least started its operation in nominal performance.”

He was grateful that Astrobotic afforded his team enough power supply to make those confirmations.

“We’re all in this boat together,” he said of the other groups hitching a ride on Peregrine. “These payloads are in Hail Mary mode.”

For Astrobotic, it was a similar story of rapid mobilization, experimentation and hope as the rest of the world tried to lend a helping hand.

“Anything you need,” Tory Bruno, chief executive of United Launch Alliance, said on X, hours after his company’s rocket sent Astrobotic’s Peregrine lander into space. “Our team is at your disposal, if we can help in any way.”

Advertise with us

A German nonprofit that monitors satellites also sent encouragement on social media, and posted its own readings on Peregrine shortly after the on-the-ground team lost communications.

It wasn’t clear if the outside help made any difference to the mission outcome. By 9 p.m. Monday, Peregrine had burned through most of its fuel correcting for a propellant leak that began hours after launch.

But Astrobotic welcomed the support, writing in a public update “this is what makes the space industry so special, that we unite in the face of adversity.”

Justine Kasznica, board chair of the Keystone Space Collaborative and general counsel to Astrobotic, said people in the industry understand how difficult it is to engineer in space.

And even if their guidance didn’t save Peregrine’s moon prospects, she said, the “outpouring of love and support” helped an exhausted team of engineers persevere as they worked between Pittsburgh and a commandeered hotel suite in Cape Canaveral.

Advertise with us

“I've not seen anything like it,” she said. “There's improvisation, there's real-time solutions, there's incredible engineering and out-of-the-box thinking that blows your mind.”

That work allowed Peregrine to test multiple operational systems for the first time in space, “a success in its own right,” said Ms. Kasznica, who is also the wife of Astrobotic’s chief executive, John Thornton.

“It's been probably the honor of my life to be in the room with these people,” she said.

At noon Tuesday, Astrobotic shared that it had retained enough fuel for up to 40 hours of additional flight, but had “no chance” of landing on the moon.

“We continue receiving valuable data and proving spaceflight operations for components and software relating to our next lunar lander mission, Griffin,” the company said.

Advertise with us

Griffin is set to launch on a SpaceX rocket later this year carrying NASA’s water-detecting rover, VIPER, to the moon’s south pole. A launch date has not been set, and NASA did not immediately announce changes to that mission.

It did make changes Tuesday to the broader Artemis program, which was planning to send four astronauts into lunar orbit later this year. That mission is now delayed to 2025, the agency said, and a subsequent human landing mission to the moon bumped from 2025 to 2026.

The delays were due to technical problems and safety concerns, NASA said.

The agency said it asked SpaceX and Blue Origin — contractors who are developing human landers for the upcoming missions — to start exploring variations that could support large cargo.

Evan Robinson-Johnson: ejohnson@post-gazette.com and @sightsonwheels