As planes arrived and departed over the active construction site of Pittsburgh International Airport’s soon-to-be modernized Landside Terminal, Allegheny County Executive Rich Fitzgerald became the first passenger to be driven up the newly paved terminal bridge. Airport Authority staff greeted him as he exited his vehicle and clapped.
“Welcome to what is an unbelievable investment in this community and in the future of Pittsburgh,” said Mr. Fitzgerald, standing on the bridge and addressing media and county officials during a tour of the “nearly halfway done” project.
“We are building an airport that is for Pittsburgh by Pittsburgh,” he said. “We can all be so proud of the work that’s being done.”
Mr. Fitzgerald and others gathered on this foggy Monday morning to tout the local labor and materials used to complete the $1.57 billion project. About 800 local construction workers are employed here, he said, with that number to increase to 1,000 in the near future. And more than 16,000 tons of steel made in Ambridge are going into the 700,000-square-foot terminal, which is expected to open in March 2025.

The project is being funded by airlines that fly from the airport, said Airport Authority CEO Christina Cassotis. The airport announced last month that the cost had climbed 12% — or $170 million — from $1.4 billion, an increase attributed to pandemic-related inflation and supply shortages.
“It’s so much more impressive than I thought it would be,” Ms. Cassotis said Monday. “I would say there are still some surprises, but not structurally.”
Read More
The project, once finished, will include a new landside building for ticketing, security and baggage claim, and new roads to and from it. The building will connect to the existing airside terminal. It will have 11 TSA check-ins and a brand new, faster baggage system, said Paul Hoback, chief development officer for the Airport Authority
“Currently, in our airport we have about 8 miles of baggage conveyor that goes from the airside to the landside facility,” he said. “So as you can imagine that 32-year-old baggage system takes quite a while. With the new system, your bags will probably beat you to the baggage claim.”
Design for the terminal was inspired by nature, technology and community, Mr. Hoback said. The roof is shaped to look like the rolling hills of Western Pennsylvania, has columns that are made to resemble trees and glass walls that will let natural light flow in. The building will be LEED Gold certified, he said.
“We will also be collecting all the rainfall from the building and utilizing it to irrigate these landscaped terraces,” he said.

Four outdoor terraces, two on the departure side and two on the arrival side, will connect to the terminal, allowing passengers and visitors to enjoy the outdoor space, officials said.
“It’s the customer experience,” Mr. Fitzgerald said. “They’ll be able to spend time on these terraces that are very comfortable and inviting.”
The biggest nod to Pittsburgh is the replication of the Fort Pitt Tunnel that flyers will walk through as they arrive.
“Pittsburgh has one of the greatest entrances to any city in the country,” Ms. Cassotis said. “We’re replicating that experience.
“We really hope to reflect this community for the community,” she added. “From the physical design to the materials, it’s a big deal. And how we tell the story of Pittsburgh is, I think, something we need to do more.”
Ciara McEneany: cmceneany@post-gazette.com




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.