Some 32,000 daily motorists who use Ardmore Boulevard/Route 30 in Forest Hills will face serious traffic restrictions over the next two years while crews replace three culverts and repave the roadway.

Joseph B. Fay Co. will begin preparatory work Monday on the $13.7 million project that will involve putting all traffic in the inbound or outbound lanes at various times. The project covers the area from the Wilkinsburg interchange with the Parkway East to Yost Boulevard.

The Pennsylvania Department of Transportation said single-lane restrictions start Monday between Bevington Road and Kenmore Avenue from 9 a.m.-3 p.m. on the inbound (west) side and from 7 a.m.-3 p.m. on the outbound (east) side. That work will continue until mid-January.

The major traffic restrictions will begin in spring, when the outbound lanes close and all traffic is shifted to the inbound lanes of the boulevard. The traffic pattern will be reversed for the second phase, when all traffic will use the inbound lanes while crews work on the outbound side.

Advertise with us

The two sides are separated by large, raised planters with flowers and trees.

The restrictions could cause substantial traffic problems because Route 30 is a popular connection for motorists headed for the Parkway East from North Versailles and North Huntingdon.

In addition to the culverts and paving, the project involves adding wheelchair-friendly curb ramps, drainage improvements, and signing and pavement marking installation. The project should be done by summer 2023.

Ed Blazina: eblazina@post-gazette.com, 412-263-1470 or on Twitter @EdBlazina.