For commuters and travelers coming into or through Pittsburgh from the east, be prepared for delays and detours, as PennDOT begins a scheduled closure of the westbound lanes of Parkway East / Interstate 376 beginning Wednesday morning.

The closure is scheduled to last from 6 a.m. Wednesday through 10 a.m. Sunday.

Traffic from the parkway will be routed onto the Boulevard of the Allies/Liberty Bridge (Exit 72B) ramp. The parkway will be closed from that point to the Grant Street ramp. All on-ramps in between those points will be closed to traffic.

The closure will allow crews will conduct roadway reconstruction work between the Allegheny County Jail and the Grant Street interchange, PennDOT said. Additionally, bridge dam replacement work will occur on the intersate near the jail and the Birmingham Bridge. Crews may also do concrete patch work in the bathtub area of the parkway.

Advertise with us

According to PennDOT, here is the detour for cars:

● From westbound (inbound) I-376, take the Boulevard of the Allies/Liberty Bridge (Exit 72B) off-ramp

● Take the ramp toward the Veterans Bridge (North 579 to 279)

● Take the left-hand exit to Convention Center/7th Avenue

● From 7th Avenue, turn left onto Grant Street

Advertise with us

● Follow Grant Street back to the westbound I-376 on-ramp toward the Fort Pitt Bridge/Airport

● End detour

Here is the detour for trucks:

● From westbound (inbound) I-376, take the Boulevard of the Allies/Liberty Bridge (Exit 72B) off-ramp

● Take the ramp toward the Liberty Bridge (to Routes 19/51)

Advertise with us

● Continue across the Liberty Bridge and through the Liberty Tunnel

● Turn right onto North 51/Truck 19 toward the West End

● Take the left-hand exit to Carnegie/Airport (West 376 and South 19)

● For motorists continuing westbound on I-376, take the ramp to Carnegie/Airport (West 376)

● For motorists heading back into downtown Pittsburgh, bear left towards Uniontown (South Truck 19/51)

Advertise with us

● Merge onto eastbound (inbound) I-376 Parkway West and follow through the Fort Pitt Tunnel

● End detour

PennDOT said it will work with Pittsburgh police to assist motorists at key intersections along the detour route.

To avoid potential lengthy delays on the posted detour routes, PennDOT also suggests taking the Pennsylvania Turnpike in Monroeville to the Allegheny Valley (Exit 48 – New Kensington/Pittsburgh) interchange and following southbound Route 28 to downtown Pittsburgh.

PennDOT expects the detoured routes to get backed up and are advising motorists to consider alternative routes. As a result, PennDOT is asking motorists to consider the following alternatives:

Advertise with us

● Travelers may also consider taking the Pennsylvania Turnpike in Monroeville to the Cranberry (Exit 28 – Pittsburgh/Erie) interchange. Motorists heading into Pittsburgh can follow southbound I-79 to southbound I-279 (Parkway North). Motorists heading to the Pittsburgh International Airport or points west of Pittsburgh can follow southbound I-79 to I-376 (Parkway West).

● Motorists familiar with the area should consider exiting at the Wilkinsburg (Exit 78B), Edgewood/Swissvale (Exit 77), Squirrel Hill/Homestead (Exit 74), or the Oakland/Glenwood (Exits 73A-B) interchanges to avoid the detour route.