It wasn't a happy commute for one train-load of passengers on the Port Authority's Blue Line Library light-rail system after an operator’s error damaged the electrical system Wednesday morning and caused it to stop inside the Mount Washington Transit Tunnel.

Authority spokesman Adam Brandolph said the operator was using sleet cutters attached to the pantograph about 7 a.m. to clear the overhead electrical line of frost during his outbound trip. For his inbound trip, the operator did not put down the sleet cutters, which were facing in the wrong direction and could tear the power line.

That tearing began to happen near the Sarah Station but the operator didn’t realize it. When the vehicle got past South Hills Junction and into the tunnel about 20 minutes later, the backward sleet cutter forced a circuit to open, cutting power between South Hills Junction and First Avenue.

At that point, the operator got out of the vehicle and realized the pantograph and sleet cutters had fallen off the top of the vehicle and smashed the rear window of the second car of the train.

Advertise with us

With the vehicle stranded inside the tunnel, riders got off and walked to East Carson Street to catch buses into Downtown Pittsburgh.

The agency initially described the incident as two unrelated situations with the same vehicle, the first a downed power line between the Library and Lytle stations and a circuit problem in the tunnel.

Crews fixed damage in the tunnel in about three hours. The agency detoured all rail service via its Allentown line during that time.

But replacing about 2,000 feet of the power line between the Library and Lytle stations is expected to take until Thursday morning.

The authority is running shuttle buses between Library and Lytle. From Lytle, passengers are taking a rail shuttle to Washington Junction for service into Downtown.

Advertise with us

Ed Blazina: eblazina@post-gazette.com, 412-263-1470 or on Twitter @EdBlazina.

Correction (made at 5:07 p.m., Dec. 19): An operator incorrectly left sleet cutters on the light-rail vehicle deployed in the wrong direction, causing power line damage and damaging a circuit in the Mount Washington Transit Tunnel. An earlier version of this story gave a different cause.