Authorities were on the scene early Tuesday of two vehicle crashes in Butler County that may have been weather-related, according to a dispatch supervisor in Butler County.

One of the accidents, in Cranberry, resulted in at least one injury. Two vehicles collided on Glen Eden Road in Cranberry, resulting in at least one injury.

In Parker, near Bruin, there was a two-vehicle mishap. There were no medical transports from the scene, the supervisor said.

Both crashes happened shortly before 7 a.m.

Advertise with us

Elsewhere this morning, several fender-benders have been reported throughout the Pittsburgh region.

Traffic restrictions/meetings:

Reedsdale Street tunnel/ramp, Ridge Avenue, North Shore — The tunnel/ramp that carries traffic to the southbound Fort Duquesne Bridge, northbound Route 65, and Ridge Avenue is closed through 6 p.m. Friday, Dec.15 for conduct cleaning and painting operations of the tunnel ceiling and walls.

Clinton Road Bridge over I-376, Findlay — Reduced to a single 10-foot lane in each direction as crews begin bridge reconstruction work. Restrictions through late December. Also, westbound I-376 ramp closures will occur during this work.

East Street Bridge, North Side — The bridge over Interstate 279/Parkway North is closed to traffic through Dec.14 for rehabilitation work. No southbound traffic on East Street is allowed beyond Lareda Street. Detours will be posted, using East Street to the Venture Street on-ramp to southbound I-279, then take the East Street North 28 (Exit 2B) off-ramp and continue straight onto East Street.

Advertise with us

Also, motorists traveling northbound on Madison Avenue will not have access to the bridge. The work is part of PennDOT’s $87.94 million I-279 Parkway North improvement project.

Public meeting on I-70/Route 51 interachange plans — PennDOT will be displaying its plans for the proposed reconstruction of the Interstate 70 and Route 51 interchange in Westmoreland County during a meeting from 5 p.m. to 7 p.m. on Dec. 13 at the Rostraver Central Fire Hall, 1100 Fells Church Road in Belle Vernon.

During the proposed plan calls for the reconstruction of approximately two miles of I-70 beginning at the Smithton High Level Bridge and ending near the interchange with Route 51. The proposal includes widening for lanes, a median and outside shoulders. The plan also calls for reconstruction of Route 51 from near Ridge Road to near Concord Lane. Both Rostraver and South Huntingdon will be impacted by the work.

Elizabeth Bridge (Route 51), Elizabeth, Jefferson Hills and West Elizabeth — Single-lane restrictions in each direction weekdays from 9 a.m. to 3 p.m. through April 2018. Crews will conduct shielding and paint containment installation. Also, single-lane restrictions on Route 837 (State Street) and associated ramps.

Interstate 376 — Long-term lane restrictions on westbound Interstate 376 in Findlay between Business Loop 376 West/Moon (Exit 57) and the Airport/East PA Turnpike 576 (Exit 53) interchanges, reduced to two 11 foot-wide lanes.

Advertise with us

Other restrictions in that area include:

▪ Intermittent single-lane restrictions eastbound (inbound) between Beaver County line and the McClaren Road (Exit 56) interchange, weekdays from 7 a.m. to 3 p.m. westbound and 9 a.m. to 5 p.m. eastbound as crews from Swank Construction begin median crossover work as part of the $66.3 million reconstruction project.

Glenwood Bridge — The next phase of the $17 million Glenwood Bridge interchange rehabilitation project involves the following restrictions:

▪ Around-the-clock single-lane restriction through November in each direction of Route 885 for bridge work over the northbound Route 837 ramp to southbound Route 885. One lane of Route 885 will remain open in each direction.

▪ Around-the-clock single-lane closure on northbound Route 885 in the area of the closed southbound Route 837 ramp to northbound Route 885, through November. One lane will remain open on northbound Route 885.

Advertise with us

▪ Route 837 traffic to southbound Route 885 will detoured at the Hot Metal Bridge, but southbound Route 837 traffic may continue to Becks Run Road.

▪ Also, four weekend closures will occur. PennDOT says more information will be provided once the closures are scheduled.

I-376 cashless tolling — The Pennsylvania Turnpike Commission has begun using cashless tolling on a stretch of Interstate 376 known as the Beaver Valley Expressway.

The 16.5-mile tolled portion of Interstate 376 between Chippewa and New Castle will have no toll collectors. Motorists who don’t have an E-ZPass transponder will have a photograph taken of their license plate and receive a bill once a month similar to a credit card payment with 20 days to pay. The billing cycle will start the first time a driver goes through the toll booth without a transponder and a bill will be issued 30 days later. Users of E-ZPass will have fares deducted from their account as usual.