Traffic restrictions/other news:
Parkway North/-279 — On Saturday morning, PennDOT will lift long-term restrictions on the Parkway North southbound and restore the highway back to its normal traffic pattern. Also, the Venture Street off-ramp and the on-ramp from Cemetery Lane at the Perrysville Avenue interchange will reopen.
Also this weekend, a new lane restriction will take effect southbound Parkway North between the Venture Street and the North 28 East Street (Exit 2B) interchanges. The restrictions are in effect from 7 p.m. Friday through 6 a.m. Monday. Three lanes of traffic will be reduced to a single lane on mainline I-279 in this area.
In addition, the High Occupancy Vehicle (HOV) lanes will close to traffic around-the-clock on Saturday morning through Sept. 17 so crews can install and remove barriers, make HOV lane repairs, remove signs, repaint lines, and test the gate system.
New ramp closures will also be in effect southbound:
▪ East Street off-ramp (Exit 2B) — From 7 p.m. Monday, Sept. 11 through 6 a.m. Wednesday.
▪ Venture Street on-ramp — From 7 p.m. Monday, Sept. 11 through 6 a.m. Wednesday.
▪ Perrysville Avenue off-ramp (Exit 5) — From 7 p.m. Monday, Sept. 11 through 6 a.m. Friday.
▪ Bellevue on-ramp — From 7 p.m. Wednesday, Sept. 13 through 10 a.m. Sunday.
▪ Bellevue off-ramp (Exit 7) — From 7 p.m. Wednesday, Sept. 13 through 10 a.m. Sunday morning
▪ Camp Horn Road off-ramp (Exit 8) — From 7 p.m. Thursday, Sept. 14 through 10 a.m. Sunday.
Traffic will be detoured.
Lane restrictions in the southbound direction will occur on eight weekends as crews pave, make inlet repairs, and do bridge deck and joint work. All of the work is all part of a $87.94 million Parkway North improvement project.
Liberty Bridge/Tunnel — The bridge is scheduled to close this weekend 8 p.m. Friday and extend through 5 a.m. Monday as crews continue work on the span. The inbound Liberty Tunnel will also be closed. The tunnel’s outbound lane will not be impacted. McArdle Roadway will remain open in both directions.
Ivory Avenue/Perry Highway — Road work on Ivory Avenue between Perry Highway (Route 19) and Nelson Run Road just west of McKnight Road in Ross and in Pittsburgh’s northern neighborhood of Summer Hill. The reconstruction work will last through October during the weekdays, although Ivory will be closed throughout the duration of the project. Traffic will be detoured using Perry Highway, Cemetery Lane, Babcock Boulevard and McKnight Road. Lane Construction of Bridgeville is doing the work, which is part of Allegheny County’s $8.3 road reconstruction plan to address eight roads throughout the county.
This closure on Ivory cuts off a major detour route to the entrance to 279-South, which has also been under construction for several months.
Hulton Road, Oakmont/Plum — Overnight single-lane alternating traffic for milling and paving operations through late September. Work will occur weeknights from 7 p.m. to 6 a.m. between Third Street in Oakmont and Coxcomb Hill Road in Plum. Weekend work may occur.
Interstate 376 — Long-term lane restrictions on westbound Interstate 376 in Findlay between Business Loop 376 West/Moon (Exit 57) and the Airport/East PA Turnpike 576 (Exit 53) interchanges, reduced to two 11 foot-wide lanes. The new configuration will be maintained through mid-November as crews reconstruct the concrete roadway, and conduct bridge and ramp repairs.
▪ Also, westbound I-376 off-ramp to Business Loop 376 West/Moon (Exit 57) will be reduced to a single-lane lane through mid-November. The ramp will remain open as crews conduct roadway reconstruction work.
Other restrictions in that area include:
▪ Intermittent single-lane restrictions eastbound (inbound) between Beaver County line and the McClaren Road (Exit 56) interchange, weekdays from 7 a.m. to 3 p.m. westbound and 9 a.m. to 5 p.m. eastbound as crews from Swank Construction begin median crossover work as part of the $66.3 million reconstruction project.
Stroschein Road, Monroeville — Closed through mid-November for replacement of the Dirty Camp Run Bridge No. 9 off Pitcairn Road. Traffic will be detoured using Northern Pike Road and Pitcairn.
Middle Road, Shaler/Hampton — Road reconstruction work from Saxonburg Boulevard (Shaler) to Harts Run Road (Hampton); works consists of base repairs, patching and road reconstruction and drainage.
Roberto Clemente Bridge (Sixth Street Bridge) — The bridge will be closed on some Fridays to accommodate Pirates games:
▪ On game days, the bridge will be closed to vehicular traffic starting at 2 p.m., and it will reopen to vehicular traffic one hour after the end of each game.
• Saturdays, Sundays and Holidays – On game days, the bridge will be closed to vehicular traffic at various times requested by the Pirates, and it will reopen to vehicular traffic one hour after the end of each game.
• Sidewalks on the Roberto Clemente and Rachel Carson bridges will be open for all games.
Detours are posted.
McClaren Road, Findlay — McClaren Road closed between Garden Lane and Mustang Drive through mid-November so crews from Golden Triangle Construction to conduct road reconstruction and bridge repairs.
Interstate 79, Butler County — Lane closures in each direction during off-peak hours, between 6 p.m. and 6 a.m. daily with two exceptions. On Fridays, work in the northbound lanes will start at 9 p.m. and on Sundays work in the southbound lanes will be start at 9 p.m., through October.
Warrendale Bayne Road, Marshall — Lane closures as part of a $1.28 million road improvement project will last through October:
• Intermittent single-lane alternating traffic will occur as needed on weekdays from 9 a.m. to 3 p.m. and weeknights from 7 p.m. to 6 a.m. as crews conduct the work at intersection with Brush Creek Road/southbound I-79 on-ramp, and at intersection with Innovation Drive. A single lane in each direction will be maintained during peak travel times. The southbound I-79 ramp will remain open during construction. Crews from Frank J. Zottola Construction, Inc. will conduct roadway widening, milling and paving, drainage improvements, sidewalk improvements, signal upgrades and pavement marking installation.
Glenwood Bridge — The next phase of the $17 million Glenwood Bridge interchange rehabilitation project involves the following restrictions:
▪ Around-the-clock single-lane restriction through November in each direction of Route 885 for bridge work over the northbound Route 837 ramp to southbound Route 885. One lane of Route 885 will remain open in each direction.
▪ Around-the-clock single-lane closure on northbound Route 885 in the area of the closed southbound Route 837 ramp to northbound Route 885, through November. One lane will remain open on northbound Route 885.
▪ Route 837 traffic to southbound Route 885 will detoured at the Hot Metal Bridge, but southbound Route 837 traffic may continue to Becks Run Road.
▪ Also, four weekend closures will occur. PennDOT says more information will be provided once the closures are scheduled.
Andy Warhol Bridge — Closed to vehicular and pedestrian traffic through November as part of $25.4 million rehabilitation project. The Rachel Carson Bridge (9th Street) will be used as a detour. The detour also will reroute about 350 Port Authority buses a day to Carson, according to the Port Authority. The detoured routes will be routes 1, 2, 4, 6, 7, 8, 11, 12, 13, 15, 16, 17 and the O5. The Carson Bridge is expected to be rehabbed in 2018 and the Clemente Bridge in 2020.
I-376 cashless tolling — The Pennsylvania Turnpike Commission has begun using cashless tolling on a stretch of Interstate 376 known as the Beaver Valley Expressway.
The 16.5-mile tolled portion of Interstate 376 between Chippewa and New Castle will have no toll collectors. Motorists who don’t have an E-ZPass transponder will have a photograph taken of their license plate and receive a bill once a month similar to a credit card payment with 20 days to pay.
The billing cycle will start the first time a driver goes through the toll booth without a transponder and a bill will be issued 30 days later. Users of E-ZPass will have fares deducted from their account as usual.
Cavasina Drive, Canonsburg — Northbound lane closure at the intersection with Route 1009/Morganza Road and Route 1025/Weavertown Road in Canonsburg/North Strabane through Sept. 14 to allow crews to perform intersection widening and traffic signal upgrades.





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.