Murrysville council heard a recommendation from the municipal Traffic Impact Advisory Committee Nov. 18 to increase traffic impact fees. The committee also provided a checklist of ten potential transportation improvement projects, at an estimated cost of more than $6.5 million, to consider over the next 20 years.

As developers build new homes and businesses, the impact of more traffic on bridges, roads and intersections can create bottlenecks, slow downs and road hazards in a community. Some communities impose a traffic impact fee on developers to fund improvements to transportation infrastructure, such as turning lanes and traffic signals.

The committee has recommended council consider raising the traffic impact fee from $1,195 to $1,335 per trip during peak traffic hours. The fee is determined by an engineering trip guide that projects the number of trips during peak traffic hours, depending on how the land is used.

In a report presented by Michael Mudry, a consultant with Traffic Planning and Design of Upper St. Clair, among the types of transportation projects recognized by the state are those that correct deficiencies caused by the demands of new development. Mr. Mudry said Murrysville’s traffic impact fee is not the highest in the region, citing Peters township at $1,400 per trip and Cranberry at $1,500 per trip.

Advertise with us

Projects to remedy the third type of deficiency can be addressed by use of traffic impact fees.Mr. Mudry presented ten transportation improvement projects, some of which, he said, meet the criteria for funding through traffic impact fees. The projects include:

• Old William Penn Highway and School Road — Installation of a traffic signal, $350,343.

• Old William Penn Highway and Tarr Hollow Road — Installation of a traffic signal or roundabout, $1,036,465.

• Old William Penn Highway and Sardis Rd /Vincent Hall Road — Construction of a 150-foot, westbound turning lane on Old William Penn and a 180-foot southbound, turning lane on Sardis Road, $1,503,185.

• Sardis Road and Bulltown Road — Construction of 100-foot, northbound turning lane, $443,650.

Advertise with us

• Sardis Road and Logan Ferry Road — Installation of a traffic signal and construction of a 150-foot, north bound turning lane, $1,738,829.

• Trafford Road and Pleasant Valley Road — Installation of a traffic signal, creation of a 90 degree intersection and a right-turn channel for southbound traffic on Trafford Road, $281,583

• Old William Penn Highway and Cline Hollow Road — Installation of traffic signal and 100-foot turning lanes for east and westbound traffic, $1,217,481.

• School Road and North Hills Road — All-way stop control, $825

• Sardis Road and School Road — Stop control, $825

Advertise with us

• A road sufficiency analysis, $35,000

Officials said the majority of the development is projected for the south eastern corridor surrounding Route 22 and Old William Penn Highwayand  along Sardis Road.

“Many of these intersections are already providing level D or F service,” chief administrator Jim Morrison told council. “They are major choke points in our transportation flow.” Mr. Morrison told council that there is approximately $1 million in the traffic impact fund.

While most council members appeared not to have issues with the recommended projects, council President Joan Kearns advised caution is being too quick to make changes.

“I’ve been on every one of these intersections in my 40 years of living in Murrysville,” she said. “This will drastically change the appearance of this town. The original town square is at Sardis and Old William Penn. We must be very careful. I cannot support destroying the Old William Penn corridor. It is fine to say we’ll put in a 150 foot turning lane, but what is the impact on the residences? Go slowly.”

Advertise with us

“It is a 20 year plan,”  Mayor Robert Brooks responded.

According to municipal planning director Alan Cohen, the advisory committee will make recommendations for action by council.

Tim Means freelance writer suburbanliving@post-gazette.com