The half-mile area where the borders of Braddock, Rankin, North Braddock and Swissvale come together has become the Bermuda Triangle of bad bridges.

In that small area, three bridges are in various states of deterioration. By the end of this month, all of them will be closed or severely restricted, playing havoc with Port Authority routes in that area.

The bridges are:

• Tassey Hollow Bridge between Woodstock Avenue in Swissvale and Hawkins Avenue in North Braddock. This bridge, owned by the Port Authority, will be closed for 10 months of reconstruction.

Advertise with us

• Kenmawr Bridge between Rankin and Swissvale that goes across railroad tracks at the end of the Martin Luther King Jr. East Busway. The bridge, a major connection between the Parkway East, the Rankin Bridge and Kennywood Park, currently has weight restrictions and cannot be used by buses. PennDOT is coordinating its replacement in 2017.

• Overland Bridge on Overland Street between Braddock and North Braddock, which goes over the same railroad tracks as Kenmawr. Owned by the two financially struggling boroughs, it has been closed for about a year due to structural problems and will remain closed until they find the $1 million needed to repair it.

As a result of the upcoming closure of Tassey Hollow this month, Port Authority routes 61A, 61B and 59, will be changed beginning Nov. 22. Two of them saw changes when restrictions were placed on Kenmawr.

“It’s par for the course, and we just do the best we can with rerouting,” Port Authority spokesman Jim Ritchie said. “It is unusual for two bus routes to be rerouted twice for different bridges.”

Tassey Hollow, which carries about 5,600 vehicles a day, is one of a number of former trolley bridges that the authority inherited from its predecessor, Pittsburgh Railways. The current structure, which has several plates on its road surface to cover holes, was built in 1971 to replace a largely wooden structure.

Advertise with us

The $4.5 million reconstruction involves replacing the concrete deck, repairing and painting the steel structure and repairing the concrete substructure. It will be closed to traffic, including pedestrians, until late September 2016.

“In Pennsylvania, and especially Western Pennsylvania, the structurally deficient bridge problem is well documented,” Mr. Ritchie said. “It’s probably a good thing we’re getting them fixed so they are safe and sturdy.”

North Braddock’s borough manager, Doug Marguriet, said Tassey Hollow’s closure will bring another adjustment for residents.

“Fortunately, the Overland impact has been dealt with by the people who live around there,” he said. “That will happen with Tassey Hollow, too.”

The bus route changes as a result of the Tassey Hollow closure are:

Advertise with us

• 61A: Instead of proceeding on Woodstock Avenue from Swissvale into North Braddock, its route will end at the Swissvale Station on the East Busway.

• 61B: It will have a new beginning of its route to make up for stops lost by the 61A, beginning at Braddock Avenue and Seventh Street in Braddock and proceeding up Verona Street to Bell Avenue and Hawkins Avenue in North Braddock and turning down Fourth Street to Corey Avenue in Braddock to resume its normal route.

• 59: From Swissvale, instead of going out Woodstock Avenue to North Braddock, it will go on Monongahela Avenue, through Rankin on Rankin Boulevard, Braddock Avenue to Corey Avenue in Braddock and back to Hawkins Avenue in North Braddock to resume its regular route.