McKnight Road in the North Hills, nicknamed McKnightmare Road for its chronic congestion, is about to get smarter.

Aided by a $720,000 federal grant, the Pennsylvania Department of Transportation will install an adaptive traffic signal system at 11 intersections. Processors at the intersections will monitor traffic flow and communicate with equipment at other intersections, making continuous adjustments to signal timing to maximize flow.

PennDOT will connect the system to its Regional Transportation Management Center in Collier, which is staffed at all times. It also plans a separate project to add 10 traffic cameras and a variable message sign to McKnight.

All of the new features should be in place by the end of next year, said Todd Kravits, PennDOT’s district traffic engineer.

Advertise with us

Rhythm Engineering, a Kansas company that has installed adaptive systems in 74 U.S. cities, reported reductions in vehicles stopping for red lights ranging from 21 percent to 88 percent and reductions in traffic delays of 34 to 81 percent.

The company installed an adaptive system at eight intersections in the Wexford Flats section of Route 19 during a reconstruction project that was completed in 2012.

Adaptive systems also have the ability to gather and store information about traffic movement that is factored into decisions on signal timing.

According to a project narrative, signal timing in the corridor has not been updated in more than 10 years. Signals are set to a few timing patterns for peak traffic times. “However, these timings do not provide the flexibility to adapt to other fluctuations that can commonly occur in the corridor due to the wide variety of users and travel patterns,” the narrative said.

The intersections to be improved stretch from the Parkway North in Ross to Perrymont Road in McCandless. The 4.8-mile corridor has an average daily traffic volume of 30,000 vehicles.

Advertise with us

“This corridor is a classic example of urban sprawl as it is a heavy commuting corridor from the northern suburbs to Downtown Pittsburgh, but it also is very densely populated with both residential and commercial developments,” the narrative said.

Mr. Kravits said construction is expected to begin late this year or early next year, with completion by the end of 2016. The project isn’t expected to cause any significant traffic restrictions.

The $720,000 Federal Highway Administration grant is being matched with $180,000 in state funding. PennDOT has earmarked an additional $640,000 in federal funding for the cameras and message sign. The cameras will be added to an extensive network that the public can view at the department’s 511pa.com website.

The cameras will be placed at Evergreen Road, West View Avenue, between West View and Roseland avenues, Nelson Run Road, Babcock Boulevard, Siebert Road, Patrick Place, Ross Park Mall Drive, Johnanna Drive and Peebles Road.

Intersections getting adaptive signals are at Nelson Run Road, at the Red Lobster restaurant, Braunlich Drive, North Hills Village, Siebert Road, Patrick Place, Ross Park Mall Drive/​McKnight Circle, Browns Lane/​Johnanna Drive, McIntyre Road/​Northway Mall Drive, Peebles Road and Perrymont Road/​Babcock Boulevard.

Advertise with us