Port Authority will open the Wabash Tunnel as an alternate route to Downtown Pittsburgh during this weekend’s closure of the inbound Fort Pitt Tunnel.

The Wabash Tunnel, which has been closed all week during water line work, will reopen at 3 p.m. today to outbound traffic. It will close at 11 p.m. and reopen to inbound traffic from 6 a.m. to 11 p.m. Saturday and Sunday.

The tunnel typically operates in the outbound direction on weekends, but the direction is being switched to accommodate traffic during the inbound Fort Pitt Tunnel closure, which starts at 10 tonight. To reach it, drivers may exit the Parkway West to Route 51 toward Uniontown, turn left on Woodruff Street and bear right into the tunnel. The tunnel exit is on the South Side at Station Square.

The Wabash Tunnel will be closed again starting Monday as the construction work continues, authority spokesman Jim Ritchie said.

Advertise with us

The closure of the inbound Fort Pitt Tunnel that is scheduled tonight is just the start of a host of restrictions for Parkway West drivers.

The tunnel will close at 10 p.m. and reopen by 6 a.m. Monday. That will be followed by a full closure of the Parkway West in both directions between Interstate 79 and Green Tree from 10 p.m. Monday through 6 a.m. Tuesday for work on overhead sign structures and the concrete median barrier.

Monday night also marks the start of overnight single-lane closures in the inbound Fort Pitt Tunnel that will continue on weeknights through the end of the year. The lane restrictions are part of a $14.1 million project to remove the tunnel ceilings and make other improvements.

PennDOT also plans a full closure of the inbound tunnel for the weekend that begins next Friday.

Nightly lane closures in the outbound tunnel are scheduled to begin next month, PennDOT said. The on- and off-ramps at Carnegie are scheduled to close for the reminder of the year starting on the night of March 2 as a $72.8 million reconstruction of the parkway continues.

Jon Schmitz: jschmitz@post-gazette.com.