A bridge replacement project that has closed a section of Glass Run Road in Baldwin Borough has been extended until Dec. 15.

PennDOT spokesman Steve Cowan said the project, which was to have been completed by today, was extended because of a utility relocation issue.

The bridge is between Baldwin and Gensler roads and Glass Run is open to local traffic only during the work, which is part of the $11.2 million second phase of the Glenwood interchange project.

Jon Schmitz: jschmitz@post-gazette.com.