The two-year project to repair the iconic spire of the Heinz Memorial Chapel at the University of Pittsburgh is finished.

“This is the first major restoration effort for the spire since the building opened in 1938,” said Luke Lofink, construction project manager of Pitt's office of planning, design & construction.

The project was completed last month. The project began after a study in 2015 indicated that repairs would be needed to maintain the structural integrity of the spire, said Mr. Lofink.

The restoration started in March 2023, with 125 feet of scaffolding rising on one side of the building and an additional 125 feet of ladders from the roof to the point on the spire. The project was finished last month.

Advertise with us

Over the course of two years, the reconstruction cost under its $11.5 million budget to remove individual pieces from the roof, including the grotesques and lead-coated copper cladding, he added.

These pieces were then sent to the Durable Restoration Company in Ohio, which specializes in maintenance and repair of historic buildings.

The structural steel of the building went through media blasting, a process that cleans the metal of any rust, corrosion or other contaminates that could potentially damage the framework.

The Neo-Gothic Chapel was built in 1934 and finished in 1938, standing near Pitt’s quintessential landmark, the Cathedral of Learning. Philadelphia architect Charles Klauder designed both buildings.

During its construction, the chapel never closed or cancelled any of its activities: weddings, tours, religious services, concerts, lectures and classes for music department students still occurred.

Advertise with us

The overall project was completed roughly three to four months past the scheduled deadline because of the volume of work required, Mr. Loflink said.

He explained “due to the intricate, specialized nature of the work” a limited number of craftworks could be on the scaffolding at once to remove “cladding, sandblasting structure, re-coating structure and reinstalling panels.”