The Pittsburgh Board of Education took the first step toward closing Pittsburgh Arlington PreK-8 and renovating the now-closed Phillip Murray building in Mount Oliver for the Arlington students in time for next fall.

The board voted unanimously to receive public comment, with the prospect of a vote no earlier than Dec. 16. If approved, the board also would award construction contracts at the same meeting.

Renovating Murray is expected to cost $13.7 million and renovating Arlington could cost $15.2 million. The board also voted to submit its plans to PlanCon, which is the state process for seeking reimbursement.

Currently, Arlington operates in two buildings across the street from each other, one for preK-2 and the other for 3-8. If the plan is approved, all of the students would be housed in one building at Murray, which closed in 2011 and is about 1.2 miles away.

Advertise with us

The Arlington buildings date to the 1960s and had an addition in 1991. Murray was built in 1956. At 78,000 square feet, Murray is larger than the 72,000 square feet in the two Arlington buildings combined.

If the students are moved to Murray, 108 students who walk may need to take a bus, amounting to two additional buses to the 18 buses and vans already in use.

Murray houses six regional classrooms. The district will consider whether some of the students can be served closer to their homes.

It also has early childhood and early intervention programs for which the district does not provide transportation. Those students, on average, would have to travel 1.2 miles instead of 0.9 miles.

At a board education committee earlier this month, members made generally favorable comments about the plan.

Advertise with us

“I think this is something that is going to be very, very worthwhile to the students and families in that area,” said board member Bill Isler.

Board member Cindy Falls said she toured the Murray building and was “very, very impressed,” adding it is a building “students would really thrive in.”

For the principal, board member Terry Kennedy said, “It has to be a lot easier than having to split time between two buildings.”

Board president Thomas Sumpter, who said the benefits would outweigh the costs, expressed concern about access, suggesting the district perhaps ask the city or seek other ways to have an access road built.

Board member Carolyn Klug wondered if it would be possible for Port Authority to route a bus closer to the school.

Education writer Eleanor Chute: echute@post-gazette.com or 412-263-1955.