kfish

Scott residents living on streets with a history of flooding or erosion may not want to miss the commissioners’ meetings at 7 p.m. Monday or 7:30 p.m. Tuesday 11/11 because the issue of sewer repairs is expected to surface one way or another.

Flooding was supposed to be discussed Oct. 29 but that matter went down the drain after Commissioner Bill Wells offered a fee-based financing proposal to deal with the issue just before the session was to start.

"We didn't get to that issue," Commissioner and Finance Chairman Tom Castello said after the executive session. "People were burned out."

Advertise with us

Mr. Wells, who distributed his plan in a handout to officials, said he objects to Mr. Castello’s millage-based plan to pay for  it could be increased by future boards and because "the tax exempt properties, which contribute greatly to our flooding, would contribute nothing."

His proposed storm fee plan would require residents to pay $8 a month, which could be billed quarterly on sewer bills. A 2 percent discount ($1.92) would be offered if paid annually. The plan is similar to the one in Mt. Lebanon to pay for sewer work.

Mr. Castello's proposal would levy a rate of between 0.75 and 1 mill that would cost owners of a $150,000 home an additional $150 annually in property taxes.

Though both plans would bring in about $1 million, Mr. Wells is concerned that Mr. Castello’s plan would leave nothing for sewer repairs because it targets recreational improvements.

Mr. Castello called his millage increase plan "more equitable" because most land, building or home owners would be taxed. He also likes the fact that taxes are deductible and fees are not. Referring to a list of desired township improvements that could be made with the new money, the construction of a new township pool, estimated to cost about $3 million, topped the list.

Advertise with us

Mr. Castello said there is "a consensus" among officials to build a new 50-meter pool to replace the 45-year-old pool in Scott Park. Mr. Wells noted that the township has about $1.5 million left from a 2013 bond issue that could be put toward the pool work.

Other proposed projects would be a synthetic ice rink, tennis court reconstruction and various park improvements, including the establishment of a new one on Hope Street,

The township has been dealing with sewer issues for several decades. The most recent problems occurred in late June, when a heavy rainfall dumped nearly 2 inches of rain within an hour.

At the board's July 8 meeting, about 40 residents turned out to seek help in stopping recurring flooding of their homes. Some reported water damage; others said their homes were filled with sewage.

"This is the second time in less than a year that I have had 3 feet of water [in my home] and lost another car," Beth Tomasovic of Berkwood Drive said, noting that an engineer suggested she install a $13,000 sump pump with a backup generator.

Advertise with us

Frank and Marilyn Mance of Upper St. Clair, who own a commercial building near the Bower Hill-Painters Run intersection, said that structure has been flooded eight times with water from both the township and Spinner Field. Officials have asked them to produce documents that indicate who owns the pipe leading to their property.

Carole Gilbert Brown, freelance writer: suburbanliving@post-gazette.com.