Port Authority officials are reviewing whether track replacement in the Mount Washington transit tunnel played a factor in a small crack that rerouted commuters parts of Monday and Tuesday.

The crack was discovered Monday afternoon in the seam where old tracks met up with new tracks inside the tunnel. The track was prepared and normal traffic resumed before Tuesday’s afternoon rush hour.

In October, a contractor working for the authority replaced 400 feet of track in both directions inside the tunnel in October.

Port Authority spokesman Adam Brandolph said the agency is reviewing whether the previous construction was done correctly or contributed to the break.