Allegheny County Executive Rich Fitzgerald said he has been told it will be at least a year before the bridge that collapsed Friday in Frick Park is replaced — if everything goes well.

"But that's not always the case," he said.

Mr. Fitzgerald credited the snowy morning Friday for keeping people at home later than usual from work and school as the reason why more vehicles weren't on the bridge when it collapsed, and on the trails below.

Ten people were injured and seven vehicles were stranded, including a Port Authority bus, on the wrecked structure that spans a ravine in Frick Park.

Advertise with us

Three people were rushed to a hospital with non-life-threatening injuries, and a fourth person — one of two passengers on the bus — was taken to a hospital about two hours later, local officials said.

The city was fortunate that no one was more badly injured, Mr. Fitzgerald said, just like when Route 30 collapsed in East Pittsburgh a few years ago.

"It's incredible to think that nobody was more seriously injured or quite frankly killed in an incident like this, and also in the one we had a couple years ago on Route 30 when Route 30 collapsed in East Pittsburgh," Mr. Fitzgerald said. "Again, major, major thoroughfare, 30,000 cars a day using that and no fatalities. So, we've got to fix these things because one of these days our luck's going to run out."

Bridge collapse along Forbes Ave.

Mr. Fitzgerald said the collapse serves as a call to action on inspecting and improving the region's infrastructure.

"It does highlight the needs of what we have here in this region," he said. "I think it'll also show a spotlight on how often bridge inspections are done, weight limits, all the type of things that we know need to be done, and because there hasn't been money over the years, we've deferred a lot of things that need to be done."

Advertise with us

Mr. Fitzgerald said President Joe Biden, in town to deliver a speech regarding infrastructure, was in awe when he detoured to view the devastation at the scene of the collapse.

"Like all of us, he just couldn't believe it. You physically see this and you say 'Oh my God, nobody was killed?'" Mr. Fitzgerald said. "When you look at the vehicles laying down at the bottom of the ravine, he was just stunned."

Records from the inventory show that the bridge was consistently found to be in poor shape during inspections from 2011 to 2017, with estimated repairs at $1.5 million.

Mr. Gainey said the bridge was last inspected in September 2021. A statewide report from last year noted the bridge was still in poor condition.

The bridge, owned by the city of Pittsburgh, was a 497-foot bridge with a three-span steel rigid frame and carried some 14,000 vehicles a day. It was built in the early 1970s by New Castle-based Conn Construction Co. It replaced a previous bridge that had been there since 1901.