A hearing will be held Thursday to show and discuss the city's plans to build a pedestrian park over Crosstown Boulevard and connect the Lower Hill District to Downtown.
The idea for the project was first floated in 2009 as a way to help development in the Lower Hill and create a safe and efficient passage for pedestrians and bicyclists needing to get to and from Downtown and the city’s eastern neighborhoods. Estimated cost is $27 million, with funding coming from the state, county and city, and federal grants.
The greenspace connector will be built above Interstate 579, essentially capping 300 feet of depressed roadway between Bigelow Boulevard and Centre Avenue.
The firm hired for the project, LaQuatra Bonci Associates, which specializes in landscape architecture, said it has been working for the past six months and collaborating with local artists.
On Thursday, the firm will unveil the design on the second floor of the Hill House's Blakely Program Center at 1908 Wylie Avenue.
The public is invited to attend the event, which is scheduled to run from 5-7 p.m. and will include a design overview followed by a community workshop.
Read More
The most recent architectural renderings show a leafy trapezoidal park above I-579 with pathways and a restaurant/cafe with outdoor seating.
In a funding request sent to the House Transportation and Infrastructure Committe, the city said construction of I-579 "essentially decapitated the Lower Hill neighborhood from the rest of the city. Mobility between the two was either unsafe or eliminated."
In the request, Rep. Mike Doyle, D-Forest Hills said, "Pedestrians and bicyclists are forced to either travel a great distance around several blocks to negotiate a path into [or out of] Downtown or risk a very narrow and dangerous curb on an existing overpass across I-579."





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.