The last major change this year in the traffic pattern on the Liberty Bridge will begin Monday, which means the bridge and Liberty Tunnel will be closed to inbound traffic this weekend while crews prepare for the change.
The inbound lanes will be closed from 8 tonight until 5 a.m. Monday, but one outbound lane will be open all weekend. If the prep work is done early, the bridge will reopen with the morning configuration of two lanes inbound and one lane outbound.
Motorists will find a different traffic pattern when they use the bridge on Monday.
Right now, for motorists traveling inbound, there are two lanes open on the right side of the bridge, then one lane closed for construction and the far left lane open.
Beginning Monday, the first three lanes will be open and the far left lane will be closed for deck replacement.
The traffic pattern on the bridge changes three times a day during weekdays.
At 5 a.m., there are two lanes inbound and one lane outbound until 2 p.m., when it switches to one lane inbound and two lanes outbound.
At 8 p.m., traffic is reduced to one lane in each direction.
Crews for Joseph B. Fay Co. have spent the summer replacing the deck one lane at a time as part of an $80 million rehabilitation project and this is the last lane to be fixed. The deck work should be done by the end of October.
But that doesn’t mean the project is anywhere near being finished.
Additional work involving structural steel repairs, painting of the entire structure, concrete repairs, sign improvements and installation of a new alternating overhead lane control system will continue until 2018 and will require additional road restrictions.
Ed Blazina: eblazina@post-gazette.com or 412-263-1470.






Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.