Exactly five years ago today, four people were killed when a flash flood struck Washington Boulevard in the city’s East End.
That afternoon, a wall of water from heavy rainfall roared down Washington Boulevard, drowning Kimberly Griffith, 46, of Plum, and her daughters, Brenna, 12, and Mikaela, 8, after their minivan was submerged in 9 feet of water.
Mary Saflin of Oakmont was on the phone with her daughter, trying to escape her sinking vehicle, when the phone cut off as the 72-year-old was swept into a storm sewer.
Afterward, Pittsburgh made a number of changes to the area, including better stormwater sewer management and special flood training for firefighters. But another of the changes, a flood gate that blocks drivers from entering Washington Boulevard if it is flooding, is broken at the intersection of Negley Run Boulevard. The city is unsure when it will be repaired.
The gate’s wooden arm broke off when a vehicle struck it sometime “around July 4,” according to city spokesman Tim McNulty. Six weeks later, it’s still down. Mr. McNulty said the city plans to contract with the gate’s original builder, Bronder Technical Services of Prospect, for repairs. He cited the system’s complexity as a reason for the delay in getting it repaired.
Mr. McNulty said he did not know how much the repair would cost or when it would start. Officials from Bronder Technical Services could not be reached for comment.
Read More
In the interim, Mr. McNulty said, police officers from Zone 5 have been closing the road during severe weather by using squad cars to block the boulevard.
“We’re hopeful that this will be rectified as soon as possible, and confident that Zone 5 is covering that portion of the roadway,” said Councilwoman Deborah Gross, whose district includes part of Washington Boulevard.
For now, the flood gate’s fractured wooden arm sits alongside the road.
The gate at the intersection of Negley Run and Washington boulevards is one of two located on each end of the busy road. The other, at Allegheny River Boulevard, is functioning. The system also includes a warning signal, which flashes when the road is closed.
The Pennsylvania Department of Transportation paid $400,000 to have the flood gates installed in the months following the 2011 flood. At the time, it was the first of its kind in the state. Each flood gate measures the amount of water accumulating on the road. When water height reaches 4 or more inches, the gates’ arms lower, blocking the boulevard to oncoming traffic.
PennDOT conveyed ownership of the gates to Pittsburgh in May 2013, according to PennDOT spokesman Steve Cowan. Like Mr. McNulty, Mr. Cowan cited the system’s complexity as the main cause for delays in repairing it.
“We’re mindful that police and public works are on the scene there,” Ms. Gross said. “Emergency services have come a long way. We’re not operating how we were five years ago, but we need that gate to be functioning.”
Madeline Kennedy: madelinekennedy@post-gazette.com.





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.