Traffic restrictions begin today for the $80 million Liberty Bridge reconstruction.
Two years of improvements on the bridge, which served as the regional poster child of bad bridges when officials were lobbying for a new transportation bill three years ago, start with deck replacement and ramp reconstruction. Other work will include structural steel and concrete repairs, a fresh coat of paint, new signs and a new overhead alternating lane-control system.
In the first phase, the deck on the right-hand inbound lane will be replaced and the ramp to the Boulevard of the Allies will be closed so it can be rebuilt. The deck work is scheduled to take 45 days and the ramp work 52 days.
On weekdays, the traffic configuration on the bridge will change three times a day and there could be full closures for as long as 15 minutes while crews for contractor Joseph B. Fay Co. change signs and lane configurations.
There will be two lanes of traffic inbound and one outbound from 5 a.m. to 2 p.m.; one lane inbound and two outbound from 2 to 8 p.m.; and one lane in each direction from 8 p.m. to 5 a.m. The speed limit on the bridge will be 30 mph.
Weekend configurations will depend on work activities and events scheduled in the city.
Other restrictions will include McArdle Roadway being reduced to one lane approaching the intersection with the bridge from Mount Washington and from Arlington. The ramp from the Boulevard of the Allies to the Liberty Bridge and the ramp from Interstate 579 to the Boulevard of the Allies will be reduced to one lane and will have stop signs instead of merging traffic.
In 2017, the restrictions will be more severe with plans for full closures on five weekends and 26 overnights. There also will be an 80-day closure on the Boulevard of the Allies in the area of the bridge and single-lane restrictions on Second Avenue.
Ed Blazina: eblazina@post-gazette.com or 412-263-1470.







Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.