Montour Trail Council president Ned Williams said the decision to close the National Tunnel from approximately mid-December until about mid-March was difficult.

After working for 30 years to get the trail built and open, “it is no easy thing to announce the closing of this structure,” Williams wrote in his “Prez Sez” column that will appear next month in the council’s newsletter.

“In the end, concern for the safety of our trail users was paramount,” he said.

The problem is ice. Lots of ice. It forms in the tunnel “wall-to-wall and several feet high” in more severe winters. And there have been times when large columns of ice extended to the ceiling.

Advertise with us

The ice is steeply sloped, “wet with dripping water and extremely slippery,” he added. “This is not the family-friendly travel and recreational facility that our trail users have to come to expect us to provide.”

The more than 600-foot curved tunnel, named for the nearby National Coal Company that the Montour Railroad once served, is the trail’s longest. Lights and reflectors were installed to make it easier to ride through.

The tunnel is located at Mile Post 25, 2 miles west of Hendersonville. An on-road detour will be posted at the site and on the council’s website.

“It is regrettable that the Montour — the longest suburban rail-trail in the United States — will be cut in half at its center,” he said. The tunnel also sits in the middle of the just-completed Washington County section between the two recently opened bridges at Valley Brook No. 2 and Venice.

Williams knows the closure won’t sit well with bicyclists, birders, walkers and runners who have used the trail and tunnel on “those magically beautiful nicer days in the winter.” Cross country skiers and snowshoers won’t like it, either.

Advertise with us

Once formed, the ice is difficult to remove. Backhoes and other equipment have been used to break up and remove the ice in the spring without damaging the walls, ceiling or floor. “It is not an easy task,” Williams said.

The tunnel entrances were barricaded a year ago with 6-foot high chain-link fence sections that were bolted together. This winter the entrances will be completely covered with plywood panels mounted on the front of the portals to keep out the cold winds that have contributed to the ice build-up.

Williams said the council’s Engineering and Construction Committee, led by chief carpenter Bill Capp, drew up a cost-effective plan to close the tunnel. Volunteers built the wood panels.

The goal is to keep the inside air slightly above freezing — or just below it — to reduce the amount of ice formation. If successful, it will enable the council to open the tunnel “significantly earlier than the late April date of recent years,” Williams said.

The Somerset County Rails-to-Trails Association, which usually closes the massive metal doors of the 3,294-foot Big Savage Tunnel on the first Friday in December until the first Friday in April, has found the annual closures to be fairly successful in preventing ice build-up.

Advertise with us

Williams hopes the complete closure of the tunnel will mean an earlier opening in 2016 when “large crowds of springtime trail users,” excited to see and cross the new trail bridges near the tunnel, won’t have to wait until the ice melts to continue their rides through the tunnel.

He said the council has met with consultants whose expertise is tunnel-lining systems. “They shared some preliminary ideas, which, if implemented, might provide a permanent solution to the tunnel’s water and ice problem, and allow the tunnel to remain open year-round.”

Information: www.montourtrail.org.

Larry Walsh writes about recreational bicycling for the Post-Gazette.