In 2016, a Downtown developer took a gamble buying a gigantic old South Side cargo terminal with plans for an overhaul totaling tens of millions of dollars to bring it into the 21st century.

The decision now appears to be paying its first dividends.

Six years after buying the former River Walk Corporate Centre for $12.5 million, McKnight Realty Partners has made big strides in building occupancy at a time when many landlords have struggled to keep and attract tenants because of the pandemic.

In the first phase of the rehab, the developer increased the occupancy of what is known as the West Building from about 30% to more than 80% with a focus on creative office space and one-of-a-kind amenities.

Advertise with us

“We were pleasantly surprised with how fast the market responded to it,” said Izzy Rudolph, McKnight president of development and acquisitions.

The latest new tenants to agree to move into the complex, now known as the Highline, are Aliya Health Group and PLS Logistic Services.

Aliya will occupy 3,300 square feet in the West Building. Cranberry-based PLS is taking 5,600 square feet of space for a workforce that provides logistics management, brokerage and technology services to shippers.

In that regard, it appears to be a fitting match for an old cargo terminal that once was considered the largest between New York City and Chicago during a time when trains and barges ruled.

Aliya and PLS join other recently signed tenants to the West Building, including Carnegie Mellon spinoff Fifth Season, Pittsburgh Counseling and Wellness, and the Pittsburgh Business Times.

Advertise with us

In addition, tenant Maxim Healthcare Services will be expanding by 12,000 square feet in the same building to bring its total footprint to about 42,000 square feet.

Mr. Rudolph attributed part of the venture’s success to its “crown jewel” — the 500-foot outdoor park with views of the Downtown skyline that once was a street that sliced through the complex to the Monongahela riverfront.

“It’s a game-changer,” he said.

Coupling that with the Three Rivers Heritage trail at its doorstep and the interior parking for 584 vehicles, the Highline “has been really well received,” he noted.

As the West Building moves to full occupancy, McKnight will next concentrate on the redevelopment of the East Building, which is about 25% to 30% occupied and where the developer intends to add new systems and windows among other improvements.

Advertise with us

It also is planning the rehab of the powerhouse building that overlooks the river, although it has yet to decide exactly what it will do with it. Among the options are retail or office.

In all, the total cost to remake the entire complex, which was completed in 1906, will likely top $100 million. While the terminal appears to be two buildings separated by the park, it is actually one built on a hillside.

Although there’s still much work to do, McKnight is heartened by the success of the rehab so far.

“We’ve definitely proven the concept,” Mr. Rudolph said. “Pittsburgh had never really seen space like this or amenities like this. It’s been very well received.”

Beyond office tenants, the Highline is home to de Fer Coffee and Anytime Fitness. Sly Fox Brewing will be opening in April and Burgh’ers Brewing also this year.

Mark Belko: mbelko@post-gazette.com or 412-263-1262.