Pittsburgh Regional Transit’s on-time bus performance for the fiscal year that ended June 30 dropped three percentage points to 63%, according to the agency’s annual service report.

The good news is that major construction projects that the agency blames for many of the service delays, the introduction next year of the University Line between Downtown Pittsburgh and Oakland and other bus route changes should help correct those problems.

When CEO Katharine Kelleman joined the agency in 2018, she set a goal of transit vehicles arriving on time 75% of the time. The closest it got to that level for buses in the past five years was 74% for the fiscal year that ended in June 2022.

Chief Development Officer Amy Silbermann said last week that construction on Fifth and Forbes avenues that often reduced traffic to one lane between Downtown and Oakland for more than a year was one of the major reasons for the drop in on-time performance. Many of the agency’s busiest routes serve that corridor.

Advertise with us

The agency expects to finish the $291 million Bus Rapid Transit project to install the bus-only lanes in 2027, which should allow the buses to better meet their schedule.

“(Construction is) taking lanes out of operation, so it’s been atrocious for trying to keep on schedule,” Silbermann said.

Additionally, the sweeping changes to bus routes the PRT board approved on Nov. 20 also should allow buses to run closer to schedule because the busiest routes will have more trips. That means they should spend less time picking up fewer passengers at each stop.

The bus route changes also are designed to provide more direct routes that reduce congestion points.

Light rail service to the South Hills, which normally runs on time more than 80% of the time because there are fewer traffic delays on rail lines, dropped nine percentage points to 74%. Silbermann attributed that to construction earlier in the year on the Mount Washington Transit Tunnel, which shifted service through the Allentown neighborhood but now has been completed.

Advertise with us

Overall, the agency’s ridership grew about 5% to 39,098,000, up from 37.2 million last year. Bus ridership grew 5.24% and light rail 7.9% while fewer riders used the Monongahela Incline (-5.85%) and Access paratransit (-2.07%). That’s a big improvement over the previous fiscal year, when ridership dropped 3.7%.

The agency has experienced steady ridership growth since January, spurred by fewer missed trips, good reviews from free service during the NFL Draft in April and near-record high gasoline prices.

In its September ridership report, the most recent month available, PRT reported 3.84 million riders with monthly increases of 15.8% on weekdays, 15.5% on Saturdays and 16.8% on Sundays. On the light rail system, weekday ridership went up 3.9%, Saturdays up 26.8% and Sundays up 86.9%.

The agency still remains about 27 million riders behind its high water mark achieved in 2019, just before the COVID-19 pandemic.

In other areas:

Advertise with us

— The number of missed trips, where passengers are left stranded because there is no operator or vehicle available, increased slightly from 0.3% to 1.1%, largely because of a driver shortage at the East Liberty garage. The overall number remains below the goal of 1.5%, but 25 routes — many of them among the busiest — didn’t meet the standard.

Missed trips had been a chronic problem until they dropped substantially during the previous fiscal year when PRT ramped up hiring and training of new drivers.

— The cost per passenger on buses increased 20 cents to $11.81 and on the light rail it went down 7 cents to $27.16.

— The number of crowded trips remained steady at 1.1%, but 12 of the busiest routes exceeded the goal of 2%.

— Passengers per hour dropped from 23 to 22.7, which PRT attributed to increased service hours.

The agency no longer provides comparisons to its peer agencies across the country because the available information usually is more than a year old.