River industry officials hope Shell Chemical’s decision to build an ethane cracker plant on the Ohio River will provide enough of an incentive to get a long-delayed, $2.3 billion lock and dam project off the ground.
The U.S. Army Corps of Engineers has been considering modernizing Depression-era locks and dams on the Ohio River at Emsworth, Dashields and Montgomery since 2003. The Corps is expected to sign off on a study justifying the work this fall, which would be enough time to get Congress to authorize the project before the current session ends.
Shell has already built two docks for barges at the site, located in Potter and Center townships, Beaver County, and has moved in materials by barge as part of its preliminary work. Industry officials expect the company, a division of Netherlands-based Royal Dutch Shell, will rely on the river to move material and they say the businesses expected to be created by the cracker plant also will need dependable river infrastructure.
“I think the Corps will be more motivated than they have been to get this study authorized,” said Michael Toohey, president and CEO of the Waterways Council. “It’s a tremendous economic investment by Shell, located right by the Montgomery lock, and it’s going to rely on inland waterways transportation.”
Shell has not said much about how it plans to use the river to the Corps or to Mr. Toohey’s group, which represents barge operators, shippers, port officials and other river interests.
A Shell spokesman did not respond to emails and a phone call seeking comment.
Read More
The locks and dams at Emsworth, Dashields and Montgomery were built between 1922 and 1936 and were rehabilitated in the 1980s and early 1990s. They are among the more than 60 percent of locks and dams on the nation’s rivers that are beyond the 50-year life expectancy of river infrastructure.
Barge operators say older infrastructure breaks down more often, causing costly delays in the movement of coal and other goods.
They fear a major failure at one of the three facilities would bring traffic on the Ohio River to a halt.
Peter Stephaich of Campbell Transportation, a Houston, Pa., company that operates a fleet of barges, said a breakdown — particularly at the Montgomery facility near the cracker plant — would be bad news for Shell.
The Corps project will “improve the reliability of that lock that they’re going to be very reliant on,” he said.
Once Congress authorizes the work, the Corps will have to update its analysis of the economic benefits of the project, said Lenna Hawkins, the Corps deputy district engineer.
She said that by law, the Corps cannot consider the economic activity that the Shell cracker plant is expected to generate to justify the work.
But Shell’s formal announcement last month that it will proceed with the multi-billion dollar plant will allow the Corps to take that work into consideration to some extent.
“It will be up to our economist as to how much,” Ms. Hawkins said.
To her knowledge, the only contact Shell officials have had with the Corps was to obtain the necessary permits for the dock facilities at the site.
Len Boselovic: lboselovic@post-gazette.com or 412-263-1941.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.