The way we get around Pittsburgh can be way stupid when you think about it.
I mostly don’t think about it. I can walk to work in about 15 minutes or bike there in 5, but on the second Thursday of this month I got a taste of what the average commuter deals with every day.
Stupidly, I’d arranged to meet a guy at 5 p.m. at the Bloomfield Bridge Tavern. That’s when the place opened, and the man needed to get to the Penguins game that night.
I checked out a company car from our lot betwixt the North Side stadium at about 4:45 p.m. — the optimum moment to get sucked into the rush-hour maelstrom.
The Pirates were playing on the North Side. The Penguins were playing Uptown. Wilco was playing at Stage AE for nearly 5,000 fans. Tens of thousands of drivers were getting off work and looking to make their way home alone. All that was happening within about a one-mile radius.
I knew enough not to head straight east toward PNC Park. I wound up driving in a west-north-east-south rectangle to make my way to River Road and then the 31st Street Bridge, but even these back roads were thick with savvy commuters.
Read More
My interviewee patiently waited as it took me more than hour to make what should have been a four-mile trip. About halfway there, it occurred to me that had I taken my bike on the river trail, I’d have been at the bar already.
I don’t consider myself an avid cyclist, though I’m on my bike almost daily. I grab it when it’s the most sensible conveyance for a given trip, which are usually pretty short. I used the wrong transportation tool that night, and I lament that Pittsburghers don’t have more choices for most crosstown trips.
I thought about that again Wednesday morning as hundreds of thousands converged on the Golden Triangle for the 11 a.m. Penguins parade. Healthy Ride saw a bump up in its bicycle rentals on what’s usually its slowest day, and fans sardining the subways and buses were putting the sweat into hockey sweaters. (Is there such a thing as a fragrant foul?) The Port Authority ran 11 extra rail cars and also put additional buses on the Martin Luther King Jr. East Busway, sending its usual Wednesday ridership soaring from around 210,000 to 360,000.
We have only the north-south light rail routes because 21 years ago, when Republicans briefly held a majority on the Allegheny County Board of Commissioners, they killed the Spine Line plan that would have connected Oakland with Downtown. I’ve often wondered since if they were double agents working for another metropolis.
Port Authority Chairman Neal H. Holmes tried to put a good spin on it back in May 1996, saying “board members have decided that rather than focusing on one corridor, they will begin a process to develop a long-term public transit vision for Allegheny County.” (Pause for laughter.)
Yes, why focus on the corridor linking the second- and third-largest job centers in Pennsylvania when the Port Authority could instead embark on “a visioning process”? Really, those were the words. The authority was funnier than “Seinfeld” back then.
Anyway, a decade and a half after that Spine Line-chilling decision, the North Shore Connector wound up as something of the consolation prize. I predicted then that the aggressively misnamed “Tunnel to Nowhere’’ would be like Mayor Sophie Masloff’s idea for a new ballpark on the North Side: at first the object of ridicule, but packing in crowds once in place. Sure enough, that happened as soon as it opened five years ago.
But there’s so much more left to do. President Donald Trump campaigned on pledges to invest heavily in infrastructure but dedicating that money is the tricky part. A U.S. Department of Transportation letter to the city this month said the president’s budget for 2018 “proposes no funding for new projects.”
Mayor Bill Peduto and County Executive Rich Fitzgerald say not to worry. Feds always throw cold water that way. They still believe the state, federal and local money will arrive to build Bus Rapid Transit — electric vehicles in dedicated lanes — between Downtown and Oakland.
If that sounds like a comedown from the Spine Line, it is. But Mr. Peduto says this could be done by 2021 for $240 million, and light rail would cost more like $3 billion and take about 15 years. This BRT would use Forbes and Fifth avenues and then extend on three prongs, to Squirrel Hill and Highland Park on existing streets and to Wilkinsburg via the busway. The plan also includes smart traffic lights, bike lanes on Fifth Avenue in Oakland and elimination of that dangerous contra-flow bus lane there. Informational neighborhood meetings are scheduled along the routes for the next couple of weeks.
Let’s get moving, shall we?
Brian O’Neill: boneill@post-gazette.com or 412-263-1947 or Twitter @brotheroneill





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.