Motorists who use the Neville Island Bridge on Interstate 79 will have to deal with weekend restrictions for the next four months.
The Pennsylvania Department of Transportation announced Thursday that traffic will be reduced to one lane in each direction starting at 8 p.m. Friday through 6 a.m. Monday for bridge deck repairs. That work, which will occur on the northbound lanes this weekend, will continue each weekend through late October.
The work is part of a $43 million upgrade of the bridge that started last year and will continue through summer 2023. Trumbull Corp. is the prime contractor for the complicated project, which also will include four weekends this summer when the southbound lanes are completely closed.
The bridge, which crosses the Ohio River between Glenfield on one side and Robinson and Neville on the other side, is getting the full treatment in a three-year project: structural steel repairs; full structure painting; bearing and deck joint replacements; deck repairs and overlays; bridge barrier repair; substructure concrete work; drainage improvements; concrete roadway reconstruction; guide rail replacement; and preservation work on four sign structures.
The I-79 bridge above Deer Run Road, north of the Neville Island Bridge, also is receiving preservation work as part of the project.
And that’s only part of the orange barrel brigade in that area. Just to the north, PennDOT also is upgrading a series of I-79 bridges in Glenfield, Sewickley Hills, Franklin Park, Kilbuck, Ohio Township and Aleppo in a $26.5 million project by Joseph B. Fay Co.
Ed Blazina: eblazina@post-gazette.com, 412-263-1470 or on Twitter @EdBlazina.






Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.