Here’s a list of projects PennDOT expects to be working on in 2018 in Lawrence County:
Projects continuing from 2017 with minor work remaining
Route 2020 Pleasant Hill Road Bridge Replacement
Minor work, including grooving of the bridge deck and guiderail installation, continues on the $1.21 million Pleasant Hill Road bridge replacement project. The bridge is expected to reopen to traffic in mid-March.
Route 18 Mahoning Viaduct
An epoxy overlay on the bridge deck and painting completion remain on the $11.68 million Route 18 Mahoning Viaduct project. Work will resume this spring that will include a closure with detours. Bridge rehabilitation work, including expansion dam replacement, steel repairs, and railing improvements have been completed. The overall project is expected to conclude in late April 2018.
Projects continuing from 2017 with major work remaining
2017 Group Resurfacing Contract
The routes listed below will be milled and resurfaced with drainage improvements and minor rehabilitation under a 2017 contract group project:
• Cascade Street (Route 1007) in the City of New Castle
• Savannah Road (Route 2001) in Shenango Township
• Mercer Road (Route 2018) in Perry Township
Projects starting construction in 2018
Route 65 Ellwood Road Rehabilitation
The Route 65 rehabilitation project between Old Princeton Road and Gibson Street in Shenango Township is anticipated to begin May 2018. Traffic will be maintained during work performed in this year. The estimated $3-4 million road rehabilitation will include pavement patching, milling and resurfacing work, traffic signals updates, pedestrian facilities, guiderails and drainage upgrades, and pavement marking installation. The overall project will conclude in December 2018.
Route 168 – Galilee Road to Moravia Street
Over four miles of Route 168 between Galilee Road near Route 18 in North Beaver and Moravia Street in Taylor will be resurfaced on this estimated $10-12 million project. Additional work includes bridge rehabilitation and preservation; milling; drainage and guiderail improvements; curb and sidewalk repairs; and pavement marking installation. Work is anticipated to begin in May and continue through the 2019 construction season.
US 422 Benjamin Franklin Highway
Roadway resurfacing, including concrete pavement patching and bituminous overlay, the addition of a median barrier, drainage repairs, guiderail improvements and minor structure preservation will begin in late May on this estimated $9-12 million project. Long-term single-lane closures will occur in each direction on Route 422 between Harbor Village Drive in Mahoning Township and Daniel Road in the City of New Castle. The lane restrictions will continue throughout the remainder of the year, when the project will be completed.
Route 65 Bridge Demolition
The removal of the Route 65 bridge over Big Run between Cass Street and Lakeview Avenue near Cascade Park in the City of New Castle has begun. This $898,758 project will include the removal of the existing bridge and result in a continuous roadway extension. Lane restrictions will occur with one lane in each direction open to traffic. A two-week closure and detour of the bridge will occur toward the end of the project. The overall project will be completed in late October 2018.
Route 208 Pulaski-New Bedford Bridge Replacement
A full bridge replacement, along with minor approach roadway work is anticipated to begin mid-May on this estimated $800,000 to $1 million project. Utilizing Accelerated Bridge Construction (ABC) techniques, Route 208 traffic will be detoured for five days with additional lane restrictions as crews conduct work on the structure over a branch of Deer Creek, approximately 200 feet west of the intersection of Route 208 and Valley View Road. The overall project is anticipated to be completed in mid-September 2018.
Route 288 Wampum Avenue Bridge Replacement
Route 288 (Wampum Avenue) will undergo a bridge replacement project between Mason Street and Oswald Street in Wayne Township in the fall 2018. The estimated $9-10 million project will include a full replacement of the existing bridge and other miscellaneous construction improvements. Also included will be a roadway reconfiguration at the intersection of Wampum Road and Oswald Street. Lane restrictions will occur with one lane in each direction open to traffic. One weekend closure will occur toward the end of the project to connect the existing road to the new structure. The overall project will be completed in December 2019.
Route 488 Portersville Road Bridge Replacement
Work is anticipated to begin in March and conclude in August 2018 on the $5.29 million Route 488 Portersville Road bridge replacement project located between Hickernell Road and Wurtemburg Road in Perry Township. Traffic will be detoured as replacement and approach roadway construction occur.
Route 956 Neshannock Falls Road Bridge Replacement
The $921,452 project to conduct bridge replacement work on Route 956 over Hottenbaugh Run will begin this spring in Scott Township between Eastbrook Harlansburg Road and Leonard Avenue. Work will include a full replacement of the existing bridge with minor approaching roadway work. A full closure and detour will be implemented to allow crews to complete the project in the late summer 2018.
Route 2006 East Washington Street Bridge Replacement
This estimated $7-8 million full bridge replacement project on East Washington Street over Neshannock Creek in the City of New Castle may have preparation work beginning this year, with the majority of the project occurring in 2019. Work will include a bridge replacement and minor approach roadway work. The overall project is expected to conclude in the Fall of 2020.
Route 2030 Mountville Truss (Harris Bridge) Rehabilitation
The Mountville Road truss (Harris Bridge) rehabilitation project between Heinz Camp Road and Nye Road in Perry and Slippery Rock townships is anticipated to begin in early March. The $2.37 million rehabilitation on the bridge that carries Mountville Road over Slippery Rock Creek will include replacement of the truss floor system, deck and barriers, bearings, and one wingwall. Additional work includes substructure concrete repairs, structural steel repairs, full painting of the truss, and guiderail updates. The project will start with a full closure of the bridge and traffic will be detoured until November. The overall project will conclude in November 2018.
Route 3010 West Washington Street Bridge Rehabilitation
The West Washington Street bridge rehabilitation project over the Shenango River in the City of New Castle will have minor work occurring this year. Major construction activities on the estimated $3-4 million project will occur in 2019 including replacing the existing reinforced concrete decks and sidewalks, new concrete approach slabs, full superstructure painting and other minor repairs. Half-width construction will be implemented to maintain vehicular and pedestrian traffic along the structure during construction. Work is expected to conclude in mid-November 2019.
Route 4005 Pulaski Road Bridge Replacement
This estimated $1 million culvert replacement project over a branch of the Shenango River in Pulaski Township will begin in the fall of 2018. Traffic on Pulaski Road will be detoured during the work, which will conclude in December of this year.
Route 4015 Churchill Road Superstructure Replacement
This estimated $500,000 to $1 million superstructure replacement project over Route 224 in the Mahoning Township may have minor tree trimming and utility work begin this fall, with the majority of the project occurring in 2019. Crews will conduct superstructure replacement and concrete repair work. The overall project is expected to conclude in the Summer of 2019.
Group Resurfacing Contract
The routes listed below will be milled and resurfaced with drainage improvements and minor rehabilitation in 2018 under a contract group project (work areas may be subject to change).
• Main Street (Route 288) from River Road to near Oswald Road (Route 2001) in Wayne Township.
• State Road (Route 388) from Route 422 to Eastbrook Volant Road (Route 168) in various municipalities.