The Parkway East/I-376 has reopened after a dump truck rolled over, shutting down the highway for about two hours Friday morning.
The rollover occurred around 10:00 a.m. just east of the Edgewood/Swissvale (Exit 77) interchange. The driver, a 53-year-old man from McDonald, sustained a minor injury.
Gravel and diesel fuel spilled from the truck and was strewn across the highway. Traffic had to be detoured at the Squirrel Hill/Homestead exit (Exit 74) until emergency crews cleared the scene.
Also, PennDOT announced today that starting at 8 tonight, the East Ohio Street ramp to northbound Route 28 will be closed until 6 a.m. Saturday. Crews will apply a protective sealant to the ramp. Traffic will be detoured.
Other traffic restrictions in the region:
Parkway East/I-376 — Outbound (eastbound) Parkway East will be closed this weekend starting at 10 tonight (Oct. 28), between the Grant Street (Exit 71A) interchange and the Boulevard of the Allies on-ramp to eastbound I-376. Parkway will reopen at 5 a.m. Monday. Crews from the Joseph B. Fay Co. will be painting on the Birmingham Bridge and replacing an expansion dam on I-376. Detours will be posted.
Read More
West Carson Street — Single-lane restrictions in each direction, between the Corliss Tunnel and the West End Bridge, through Nov. 10 from 8 a.m. to 4 p.m. Mondays through Thursdays for tree and brush trimming.
Liberty Bridge — All four lanes have reopened. Short-term lane restrictions will continue during overnight and off-peak daytime hours throughout the rest of 2016 and the beginning of 2017. Single-lane restrictions on the ramp to and from the Boulevard of the Allies and the sidewalk closure for the bridge will remain in place. The entire $80 million reconstruction project will finish in 2018.
PennDOT, the contractor and a team of consultants are still working on the design of a permanent fix for a 30-foot steel chord that was damaged in the Sept. 2 fire. OSHA is investigating the fire, which occurred when a steel-cutting operation near the top of the bridge ignited plastic pipe being stored below.
Westbound I-376 ramp to airport — Concrete grinding work will occur on the westbound I-376 off-ramp to Pittsburgh International Airport (Exit 53) through Oct. 29 from 7 a.m. to 5 p.m. each day. Traffic will be restricted to a single 12-foot lane; the ramp will remain open at all times. Work is part of a $66.34 million I-376 reconstruction project by Swank Construction.
McKnight Road, Ross — Overnight lane restrictions, both directions through end of the month. Crews from A. Folino Construction working on lengthening left-turn lane on northbound McKnight Road at McKnight Circle, and realign the concrete median island and repair curb. Lanes reopen 5 a.m. each day.
Route 19/Cochran Road, Mt. Lebanon — Single lane in each direction from 4 a.m. to 9 p.m. Saturday, Oct. 29 between Washington Road and Beverly Road.
Shadyside/East End — Following streets closed from 9 a.m. to 3 p.m. from Ravoux Way to North Braddock Avenue for pavement drilling: Baum Boulevard, Centre Avenue, Penn Avenue, North Dallas Avenue, Bennett Street Friday, Oct. 28 and Monday, Oct. 31 in Shadyside, Point Breeze and Homewood; No weekend work.
I-79 Neville Island Bridge — Lane restrictions as needed in each direction, between the Route 51 Coraopolis/McKees Rocks (Exit 64) and the Route 65 Emsworth/Sewickley (Exit 66) interchanges, weekdays from 9 a.m. to 3 p.m. through Oct. 28.
Ohio River Boulevard/Route 65 — Construction on southbound Route 65 has finished and the road is open to unrestricted traffic between the McKees Rocks Bridge and the Fort Duquesne Bridge. After a winter hiatus, more extensive improvement work will occur in the northbound direction in 2017.
Single-lane restrictions will occur as needed on southbound Route 65 in various locations from 7 a.m. to 5 p.m. through Dec. 31 to allow crews to install signage.
Camp Horne Road, Emsworth — Closed for construction work, about a quarter-mile north of the Camp Horne Road and Ohio River Boulevard/Route 65 intersection, through mid-November. Crews are rebuilding a retaining wall. Traffic will be detoured using Mount Nebo Road, Interstate 79 and Ohio River Boulevard.
Route 22, North Fayette — Westbound and on and off-ramps at the McDonald interchange closed through Oct. 28. Also, Potato Garden Road is closed for reconstruction work at the interchange. Ramp traffic will be detoured.
West Carson Street — Single-lane restrictions in each direction between the Corliss Tunnel and the West End Bridge today through Nov. 10 from 8 a.m. to 4 p.m. Mondays through Thursdays for tree and brush trimming.
Birmingham Bridge — Single-lane restrictions around-the-clock in each direction through Nov. 13. Bike lanes in both directions and the sidewalk on the outbound side of the bridge are open.
Andy Warhol Bridge — Closed to vehicular and pedestrian traffic through November 2017 as part of $25.4 million rehabilitation project. The Rachel Carson Bridge (9th Street) will be used as a detour.
The detour also will reroute about 350 Port Authority buses a day to Carson, according to the Port Authority. The detoured routes will be routes 1, 2, 4, 6, 7, 8, 11, 12, 13, 15, 16, 17 and the O5. The Carson Bridge is expected to be rehabbed in 2018 and the Clemente Bridge in 2020.
South Park parking restrictions — The parking lot adjacent to the Children’s Playground, at Brownsville Road and Corrigan Drive in South Park will be closed from Friday through about Nov. 11. The lot will be repaved. Parking available at South Park Fairgrounds or Nevin Grove.
Overbeck Street, Spring Hill — Closed from Solar to Brahm streets through Nov. 7 while crews finish the construction of a retaining wall to support the street.
Nadine Road, Penn Hills — Closed through mid-December for bridge replacement. Detour: Allegheny River Boulevard, Sandy Creek Road, Verona Road and Lincoln Road.
Saxonburg Boulevard, O’Hara — Bridge closed around-the-clock through Nov. 25 for replacement of bridge hat carries Saxonburg over Little Pine Creek between Kay Drive and Fugger Lane. Detour will be posted.
Wildwood Road, Hampton — Closed between Roland Road/Trillium Trail and Sylvan Drive as crews begin the second phase of slide remediation work, through November. Detours are posted. Crews are working around-the-clock on a $2.6 million project to secure two landslide areas.
Penn Avenue/Butler Street, Lawrenceville/Strip District — Restrictions between 31st Street and Butler Street on Penn in the Strip District and between Penn and 56th Street on Butler in Upper Lawrenceville, from 9 a.m. to 3 p.m. weekdays through late November; two lanes of traffic will be maintained during work hours, with the help of flaggers and officers.
Wabash Tunnel — The HOV temporary waiver has been extended through December to allow vehicles with fewer than two occupants to use the tunnel during peak hours, alleviating possible congestion on other roads caused by the Liberty Bridge rehabilitation project. The Wabash Tunnel, which opened as a commuter tunnel in December 2004, provides a shortcut for motorists from Route 51 to the South Side and Downtown Pittsburgh.
Strip District — Two adjacent portions of the Three Rivers Heritage Trail will be closed while the Buncher Co. cleans up the trail between 11th and 16th Streets, through November. From 18th to 21st streets, the trail will be closed until early next summer while NRP Group works on sanitation pipes for an apartment complex it is building there. Smallman Street is the recommended detour.
Gilkeson Road, Mt. Lebanon — Single-lane alternating traffic and temporary lane closures between Cedar Boulevard and the Galleria Shopping Center entrance from 9 a.m. to 3 p.m. weekdays through Oct. 29. Project includes milling and paving, concrete pavement patching, drainage improvements and replacements of mountable curb divisors.
East Pennview Street, Shaler — Closed for bridge replacement. Pine Creek Bridge No. 11, about a quarter mile west of the intersection of Pennview and Route 8, through spring 2017.
Route 885/Clairton Road, West Mifflin — Single-lane alternating traffic between College Drive and Ravensburg Boulevard from 8 a.m. to 6 p.m. weekdays. Weekend work from 8 a.m. to 8 p.m. may occur. Flaggers will assist motorists through the work zone.
Fox Chapel Road — Closed between Guys Run Road and Delafield Road from 7 a.m. to 7 p.m. daily for drainage repairs, milling, paving and guiderail improvements through October.





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.