Work on a section of West Carson Street in the West End is expected to wrap in late August or early next month, according to PennDOT officials.

West Carson is closed from Stanhope Street to the West End Circle. Remaining work includes:

▪ Grinding concrete for a smooth ride and texture

▪ Sawing and sealing all joints

Advertise with us

▪ Installing highway lighting

▪ Completing railing

▪ Finishing wall repairs

▪ Pavement markings including crosswalks

Other traffic restrictions in the region:

Advertise with us

Squirrel Hill Tunnel — Overnight single-lane closure inbound (westbound) in the Squirrel Hill Tunnel this week through 5 a.m. Thursday; then from 10 p.m. Friday night to noon on Saturday. Crews from Lighthouse Electric Co. will continue drilling and conduit installation work to restore cell phone service inside the tunnel. Single-lane restrictions may also occur outbound.

Andy Warhol Bridge -- Closed to vehicular and pedestrian traffic beginning at 9 a.m. Aug. 15 through November 2017 as part of $25.4 million rehabilitation project. The Rachel Carson Bridge (9th Street) will be used as a detour. The Roberto Clemente (6th Street) Bridge will still be closed before and after Pittsburgh Pirates home game.

Route 28 ramps, East Ohio Street — The on-ramp that carries traffic from East Ohio Street to northbound Route 28 is closed around-the-clock through Nov. 9. The ramp will be reconstructed with a new deck and a wall will be repaired. Detours are posted: from East Ohio, turn onto Chestnut Street and cross the 16th Street Bridge, turn left onto Liberty Avenue, left onto 31st Street Bridge, right onto the ramp to northbound Route 28.

The East Ohio Street ramp from southbound Route 28 reopened July 30.

Fort Duquesne Bridge — Lane restrictions on southbound I-279/Fort Duquesne Bridge on the lower deck of the bridge; restrictions each night from 7 p.m. to 5 a.m. through Tuesday (Aug. 2). All ramps will remain open.

Advertise with us

West Carson Street — Closed from Stanhope Street to the West End Circle. PennDOT expects the road to reopen in late August/early September. Remaining work includes:

▪ Grinding concrete for a smooth ride and texture

▪ Sawing and sealing all joints

▪ Installing highway lighting

▪ Completing railing

Advertise with us

▪ Finishing wall repairs

▪ Pavement markings including crosswalks

Route 65/Ohio River Boulevard — A long-term closure through September of southbound Route 65/Ohio River Boulevard between the Beaver Avenue Exit ramp and the West End Bridge.

Construction crews will rebuild the highway between the McKees Rocks and Fort Duquesne bridges in the latest step in a two-year, $25.3 million project. Southbound Route 65 traffic will be detoured: Motorists can follow Beaver Avenue to the Interstate 279-376 ramp to Downtown Pittsburgh and back to Route 65 inbound or stay on Beaver Avenue to the North Side. A police officer will be stationed at a traffic light on Beaver Avenue to help keep traffic moving, PennDOT said.

Crews will switch to the outbound side of the highway next spring and expect to finish work by September 2017.

Advertise with us

The $25.2 million improvement project will include concrete patching, an asphalt overlay, bridge rehabilitation, drainage and guiderail updates, signage, retaining wall repairs and pavement marking installation.

Campbells Run Road, Carnegie — Closed for work on a landslide area at the intersection of Highland Avenue. Traffic will be detoured using the Parkway West, Rosslyn Road, and Baldwin Road. The project is scheduled to be completed by next spring.

Pine Creek Road, McCandless — Bridge that carries Pine Creek Road over Pine Creek in McCandless is closed through Sept. 13. Detours have been posted, taking traffic from Route 19 to West Ingomar Road, Highland Road and eventually back to Pine Creek Road. Crews from Carmen Paliotta Constructing and Frank J. Zottola Construction will perform the work at the intersection with Route 19/Perry Highway.

Route 978/Battle Ridge Road, South Fayette — Waterline replacement: single-lane alternating traffic from Fryes Lane to Dutch Hill Road weekdays from 9 a.m. to 4 p.m. through Oct. 16. Flaggers will control traffic.

East Pennview Street, Shaler — Closing for bridge replacement to begin Aug. 11. Pine Creek Bridge No. 11 is about a quarter of a mile west of the intersection of Pennview and Route 8. Closure in place until spring 2017.

Advertise with us

Bloomfield Bridge — Single-lane restrictions in each direction weekdays from 10 a.m. to 3 p.m.; and on Blessing Street through Aug. 5.

Liberty Bridge — The next phase of the Liberty Bridge rehabilitation project has begun and with new traffic patterns, including the opening of two outbound lanes that will be separated by a work lane. Under the construction plan, traffic patterns are changed three times a day:

▪ Two inbound (northbound) lanes and one outbound (southbound) lane will be maintained from 5 a.m. to 2 p.m. each weekday.

▪ Two outbound (southbound) lanes and one inbound (northbound) lane will be maintained from 2 p.m. to 8 p.m. each weekday.

▪ One lane open in each direction from 8 p.m. to 5 a.m. each weeknight.

Advertise with us

▪ Work may occur on Saturdays and Sundays. Additional information will be provided if work occurs.

In addition, McArdle Road from Arlington Avenue will be open to two lanes of traffic during this phase of the project. It had been reduced to one lane.

In addition, PennDOT reminds motorists that the ramp from the Boulevard of the Allies to the Liberty Bridge has been reduced to one lane and has a stop sign instead of a merge. Also, southbound traffic on Interstate 579 is reduced to one lane approaching the Boulevard of the Allies and the bridge and also has a stop sign.

East Ohio Street, North Side — Long-term single-lane restrictions in each direction on East Ohio Street between Nash Street and Chestnut Street for roadway reconstruction and expansion dam work, through late September.

Route 885/Clairton Road, West Mifflin — Single-lane alternating traffic between College Drive and Ravensburg Boulevard from 8 a.m. to 6 p.m. weekdays. Weekend work from 8 a.m. to 8 p.m. may occur. Flaggers will assist motorists through the work zone.

Advertise with us

Fox Chapel Road — Closed between Guys Run Road and Delafield Road from 7 a.m. to 7 p.m. daily for drainage repairs, milling, paving and guiderail improvements through October.

McKnight Road, McCandless — Single-lane closures will occur as needed on northbound McKnight Road weekdays from 9 a.m. to 3 p.m. through July 27. Crews from the Brayman Construction Corp. will conduct roadway pavement marking installation and bridge and pipe work between West Arcadia Road and Pine Creek Road. The work is part of the $7.3 million project to improve three existing bridges carrying McKnight over Ingomar Road, Pine Creek, and Route 19.

Venetia Bridge, Peters — The bridge is closed through mid-September so that it can be replaced. A detour is posted.

Rankin, Swissvale — Single-lane alternating traffic between Fifth Avenue in Rankin Borough and Woodstock Avenue in Swissvale for drilling work, weekdays from 9 a.m. to 3 p.m. and from 7 a.m. to 7 p.m. on weekends, through Sept. 4.

O’Neil Boulevard, McKeesport — Closed as part of a slope stabilization project near Porter Street. Detour uses Eden Park Boulevard, Walnut Street, 30th Street and Patterson Street.

Advertise with us

McLaughlin Run Road, Bridgeville and Upper St. Clair — There will be alternating single-lane traffic weekdays from 9 a.m. to 3 p.m. and from 7 p.m. to 6 a.m. while crews conduct road improvements on McLaughlin Run Road between Bower Hill Road and Washington Road (Route 19).

Wildwood Road, Hampton — Closed between Roland Road/Trillium Trail and Grouse Run Road as crews conduct the first phase of slide remediation work. The second phase of work will close Wildwood Road between Roland Road/Trillium Trail and Sylvan Drive through November. Detours are posted. Crews are working around-the-clock on a $2.6 million project to secure two landslide areas.

Route 51/Route 201, Rostraver — Lane closures from around Vernon Drive in Rostraver to the Allegheny County line. The contractor, Golden Eagle Construction, is working on milling and base repairs.

Baum Boulevard bridge — The traffic pattern for the Baum Boulevard Bridge deck replacement has changed and the road closed from Melwood Avenue and Enfield Street in Bloomfield to Melwood and Gold Way. After bridge repairs are made, the boulevard from the bridge to Morewood Avenue will be closed for resurfacing. The entire project is expected to cost $12.3 million and should wrap up sometime in August.

Steubenville Pike (Route 60), Robinson and Crafton — There will be single-lane traffic restrictions on Route 60 between the intersection of Noble Avenue/East Steuben Street and Lorish Road weekdays from 9 a.m. to 3 p.m. and from 7 p.m. to 6 a.m.

Advertise with us

Greensburg Pike, North Versailles — Greensburg Pike will be closed until mid-August for road and ground stabilization work near the Save-A-Lot grocery store in the Great Valley Shopping Center. A. Merante Contracting Inc. will construct a jumbo block reinforced geo-grid wall as part of the $590,000 project. Traffic approaching the site from Turtle Creek will be detoured through the shopping center to Route 30. Access to Greensburg Pike from Route 30 will be limited to local traffic.

Noblestown Road/Route 50 — Single-lane alternating traffic will occur from 9 a.m. to 3 p.m. and 7 p.m. to 6 a.m. Monday through Friday, and possibly during weekends along Noblestown/East Main Street in Scott, Green Tree, Carnegie and Pittsburgh for road resurfacing. Crews from Lane Construction have begun work between the intersection of East Main Street and Washington Avenue in Carnegie and the intersection of Noblestown and Poplar Street in Green Tree. The project is scheduled to be completed in early August.

Red Line, Beechview — Section of the Red Line of Port Authority light-rail system that runs through Beechview is closed as part of a T reconstruction project. The Port Authority is replacing rails embedded in Broadway Avenue between Potomac and Fallowfield avenues, which will affect about 12,000 commuters who use the Red Line to get to Downtown and other locations.

The Red Line will operate as normal from Fallowfield to Downtown and the North Shore. To accommodate passengers from other parts of Beechview and the South Hills, Port Authority has offered several options.

▪ In the construction zone, a free shuttle bus will run every 12 minutes during rush hours (6-9 a.m. and 4-6:30 p.m.) and every 30 minutes during other service hours.

Advertise with us

▪ A free rail shuttle will run from Potomac to the Blue Line at Overbrook every 12 minutes in rush hours, every 20 minutes during the day and every 30 minutes in the evening.

▪ A temporary bus route, 42 Dormont, will run between the Mt. Lebanon station and Downtown via West Liberty Avenue during weekday rush hours.

The contractor hired for the project will work Monday through Saturday, from 6 a.m. to 11 p.m.

Interstate 70 — PennDOT has seven projects under way on the 32-mile stretch of Interstate 70 between Eighty Four in Washington County and New Stanton in Westmoreland County. The I-70 work is part of a multi-year series of projects to upgrade the highway. Traffic near the 1-70/​Route 19 interchange moved to the eastbound lane with two lanes in each direction.

Smithfield Street, Downtown — Northbound travel lane and parking lane closed from Fourth to Fifth avenues for the reconstruction of the Forbes Avenue and Smithfield Street intersection. The closure is expected to last through the summer.