The Parkway East closes for up to five days at 6 this morning for the demolition of the Greenfield Bridge that crosses above the highway between Oakland and the Squirrel Hill Tunnel. Here are important details about the project:

• 6 a.m. Sunday: A portion of Parkway East closes to prepare the bridge and highway for the implosion. Drivers heading east from Downtown will exit at Oakland (72A) and follow detour through Wilkinsburg. Drivers headed toward Downtown from Monroeville will exit at Wilkinsburg (78B) and re-enter the highway after Oakland.

• 7 a.m. Monday: Police close streets near the bridge in Greenfield and Oakland. Spectators who don’t want to watch on television are asked to go to Oval Drive in Schenley Park.

• 8:57 a.m.: An air horn warns the blast is coming in three minutes.

Advertise with us

• 8:59 a.m.: Police sirens give a one-minute warning.

• 9 a.m.: The bridge is imploded.

• 9:10 a.m.: If all charges have detonated, an all-clear is sounded and roads are reopened.

• The rest of the week: Crews remove debris. The highway will reopen when this is finished. At the latest, it will reopen at 6 a.m. on Friday, Jan. 1, but project officials expect the opening will come sooner.