The Roberto Clemente Bridge and the Andy Warhol Bridge are closed today through midnight for Light-Up Night festivities in Downtown Pittsburgh.

The Rachel Carson Bridge will be closed from 9:15 p.m. to 10 p.m.

Check here for a full list of Downtown closures for Light-Up Night.

Also, the Parkway East will close for two weekends to prepare for the Greenfield Bridge implosion. The outbound/eastbound side of the parkway will be closed from Oakland to Squirrel Hill/Homestead. The inbound/westbound side will be closed from Wilkinsburg/Forest Hills to Oakland. Detours will be posted.

Advertise with us

■ The first full closure is scheduled for Light Up Night weekend and begins at 11 tonight, about an hour after the fireworks display ends Downtown, and runs through 6 a.m. on Monday, Nov. 23.

■ The second weekend closure is set to begin at 10 p.m. on Friday, Dec. 4, and run through 5 p.m. Sunday, Dec. 6.

More details can be found here.

Also, lane restrictions will occur on the Liberty Bridge through Friday in each direction for survey work and platform installation.

Restrictions will take place weekdays from 10 a.m. to 2 p.m. and overnight from 8 p.m. to 5 a.m. Also, 8 p.m. to noon, Friday to Saturday; 6 p.m. to noon, Saturday to Sunday; and 6 p.m. to 5 a.m. Sunday to Monday.

Advertise with us

Other traffic restrictions:

Parkway West/I-376 -- Inbound Parkway West will be closed from 10 p.m. to 8 a.m., Friday-Saturday from I-79 to the Fort Pitt Bridge including the Fort Pitt Tunnel, and Saturday into Sunday from I-79 to Parkway Center Drive. Detours will be posted. No outbound work is scheduled.

Bus and light-rail riders -- The Mount Washington Transit Tunnel will be closed for rail replacement from 1 a.m. Saturday through 4 a.m. Monday, detouring light rail service and several bus routes. On Saturday, a special rail shuttle service will operate between Station Square and Allegheny Station. On Sunday, the shuttle service will operate between Station Square and Steel Plaza. Several Port Authority bus routes will also be affected by the closure. All riders using detoured service should allow for extra travel time. For more information, riders can visit portauthority.org.

Mt. Lebanon Boulevard -- Single-lane alternating traffic weekdays, 7 a.m. to 4 p.m. through Dec. 16 between Washington Road/Route 19 and Castle Shannon Boulevard.

Hulton Bridge -- Motorists are reminded that the recently opened Hulton Bridge, which connects Oakmont to Harmar over the Allegheny River, will maintain a lane restriction through the spring to construct the final wing wall of the new bridge after the old bridge is demolished in mid-January.

Advertise with us

Wabash tunnel -- All vehicles can now use the roadway through August 2016.

Greenfield Bridge -- Closed for two years while a new span is constructed over the Parkway East/Interstate 376. The bridge, which connects Alger Street in Greenfield with Schenley Park, will be imploded on the parkway in late December to make way for the $17.5 million construction project. The parkway will be closed for five days between Christmas and New Year’s Day. Detours are posted and can also be found, along with a construction schedule, on the Greenfield Bridge Project website of the Oakland Transportation Management Association.

Birmingham Bridge -- PennDOT says single-lane restrictions will occur periodically throughout the winter in each direction of the bridge. At least two lanes will be maintained in each direction through the end of February.

Smithfield Street, Downtown -- The portion of the street between Fourth and Fifth avenues open for time being. Then seven-month closure resumes for reconstruction of the Forbes Avenue and Smithfield intersection. A northbound lane and parking lane will be closed from Fourth to Fifth avenues. The southbound bus-only lane will remain open to accommodate the Port Authority bus schedules.

Monongahela Incline -- Closed through late November. Shuttle buses provided. Lower station service is provided at the Station Square bus shelter.

Advertise with us

Route 286/Golden Mile Highway, Monroeville -- Overnight ramp closures at Route 22 will close at 10 p.m. weekdays and Saturdays through Sunday, reopening by 6 a.m. daily. Ramp traffic detoured via Alpine Village Drive.

Homestead-Duquesne Road, Munhall -- Closed for slope stabilization project at the Franklin Bend near Vondera Street. Completion expected mid-December.

Old Clairton Road, Pleasant Hills -- Southbound traffic has shifted to newly reconstructed northbound side with northbound traffic remaining on detour through the end of November.

Renzie Road, Elizabeth Township -- Closed at Holsing Street through late November.

Round Hill Road, Elizabeth Township -- Closed until late November during replacement of a bridge structure, about a half-mile east of Route 48. It is the second closure of the road this year; the first was to correct a slide.

Advertise with us

Brightwood Road, Bethel Park -- Paving causing lane closures with flaggers directing traffic from 7 a.m. to 6 p.m. weekdays until further notice.

Monongahela Wharf -- Paving to alter entry/exit patterns.

Baum Boulevard-North Craig Street-Bigelow Boulevard, North Oakland and Bloomfield -- Baum closed to westbound traffic at Melwood Avenue through late November. Eastbound traffic in single lane. Bloomfield Bridge closed to northbound traffic until further notice.

Fall Run Road, Shaler -- Closed indefinitely between Maple Street and Middle Road. Those who live along the roadway will be able to access their homes from Middle Road.

Route 51/West Carson Street -- Closed to outbound traffic. Estimated completion June 2016.

Advertise with us

Route 51/88 intersection, Overbrook -- Northbound Route 88 closed, no access to Route 51 through late November.

Route 8, Hampton -- Northbound lane closed between Clearview Road and Murray Avenue through mid-December.

East Ohio Street, North Side -- Around-the-clock single-lane restriction of East Street from the Parkway North off-ramp to East Ohio through mid-November. East Street will be restricted to one 12-foot lane and Madison Avenue restricted to one 11-foot lane.

A reminder:

PennDOTsaid all driver’s license and photo centers, including the full-service center in Harrisburg, will be closed Nov. 26 and 27 for the Thanksgiving holiday. The Drive and Vehicle Services website, however, is available 24 hours a day.