The Greenfield Bridge is closed for two years while a new span is constructed over the Parkway East/Interstate 376.

The bridge, which connects Alger Street in Greenfield with Schenley Park, will be imploded on the parkway in late December to make way for the $17.5 million construction project. The parkway will be closed for five days between Christmas and New Year’s Day.

Detours will be posted and can also be found, along with a construction schedule, on the Greenfield Bridge Project website created by the Oakland Transportation Management Association.

Also, the new Hulton Bridge is scheduled to open Tuesday. Crews have been reconstructing parts of Hulton Road from 3rd Street to the new bridge and also on Freeport Road as the finishing touches on the project. Detours will be posted. The bridge spans the Allegheny River between Harmar and Oakmont.

Advertise with us

Southbound traffic on West Carson Street/Route 51 cannot access the Corliss Tunnel around-the-clock through 6:30 p.m., Wednesday. Detours will be posted.

Other restrictions:

Hamilton Road -- Lane restrictions 7 a.m. to 6 p.m. weekdays between Library Road/Route 88 in Castle Shannon and Baptist Road in Bethel Park.

Fox Chapel Road, Fox Chapel -- Single-lane closures from 7 a.m. to 4 p.m. from Oct. 19 to Oct. 23 for concrete staining.

Ongoing traffic restrictions:

Advertise with us

Smithfield Street, Downtown -- A portion of the street will be closed to traffic for seven months for the final phase of a reconstruction of the Forbes Avenue and Smithfield intersection. A northbound lane and parking lane will be closed from Fourth to Fifth avenues. The southbound bus-only lane will remain open to accommodate the Port Authority bus schedules.

Monongahela Incline -- Closed through late November. Shuttle buses provided. Lower station service is provided at the Station Square bus shelter.

Route 50, Bridgeville -- Repaving project from 6 p.m. to 6 a.m. daily between Chartiers and Station street through early November. Alternating one-way traffic likely during work hours.

Overbrook Boulevard -- Outbound lane closure from Overbrook Boulevard to Maytide Street from 7 a.m. to 3 p.m. weekdays through today; and intermittent overnight restrictions.

Route 286-Golden Mile Highway, Monroeville -- Overnight ramp closures at Route 22 will close at 10 p.m. weekdays and Saturdays through Sunday, reopening by 6 a.m. daily. Ramp traffic detoured via Alpine Village Drive. Continuing through late October, left turns will be prohibited throughout the work zone. Single-lane traffic continues in work zone between Route 22 and Old Frankstown Road until further notice.

Advertise with us

Route 51 -- Restricted to one lane in each direction near the Parkway West; also, the ramp from Route 51 to the outbound Parkway West and the ramp that loops outbound from the Banksville Road interchange to the eastbound parkway will be narrowed. Restrictions are expected to last about a month.

Homestead-Duquesne Road, Munhall -- Closed for slope stabilization project at the Franklin Bend near Vondera Street. Completion expected mid-December.

Old Clairton Road, Pleasant Hills -- Southbound traffic has shifted to newly reconstructed northbound side with northbound traffic remaining on detour through the end of November.

Lacock Street, North Side -- Closed between Federal and Sandusky streets.

Pennsylvania Turnpike -- Traffic paces, during which state police will slow vehicles to 20 to 25 mph, will occur weekdays in both directions between Somerset and Bedford through March. The 20-minute paces will begin at noon on Mondays through Thursdays and 9:45 a.m. on Fridays.

Advertise with us

Renzie Road, Elizabeth Township -- Closed at Holsing Street through late November.

Fairhaven Road, Overbrook -- Fairhaven Road closed between Route 51/Saw Mill Run Boulevard and Stewart Avenue through Oct. 18.

Round Hill Road, Elizabeth Township -- Closed until late November during replacement of a bridge structure, about a half-mile east of Route 48. It is the second closure of the road this year; the first was to correct a slide.

Streets Run Road, Baldwin Borough -- Closed near Brentwood Road for bridge replacement. Completion expected mid-November.

Brightwood Road, Bethel Park -- Paving causing lane closures with flaggers directing traffic from 7 a.m. to 6 p.m. weekdays until further notice.

Advertise with us

Saxonburg Boulevard, O’Hara -- Closed between Calmwood Road and Brownshill Road for culvert replacement. Completion scheduled for late October.

Monongahela Wharf -- Paving to alter entry/exit patterns.

Baum Boulevard-North Craig Street-Bigelow Boulevard, North Oakland and Bloomfield -- Baum closed to westbound traffic at Melwood Avenue through late November. Eastbound traffic in single lane. Bloomfield Bridge closed to northbound traffic until further notice.

Fall Run Road, Shaler -- Closed indefinitely between Maple Street and Middle Road. Those who live along the roadway will be able to access their homes from Middle Road.

Route 51/West Carson Street -- Closed to outbound traffic. Estimated completion June 2016.

Advertise with us

Route 51/88 intersection, Overbrook -- Northbound Route 88 closed, no access to Route 51 through late November.

Route 8, Hampton -- Northbound lane closed between Clearview Road and Murray Avenue through mid-December. Duncan Avenue closed between Route 8 and Grand Avenue through late October.

Route 50, South Fayette -- Single-lane traffic using westbound side in work zone from Washington County line to Millers Run Road through late October.

Birmingham Bridge -- Northbound side closed with traffic will be shifted to southbound lanes, with one northbound lane and two southbound lanes open. Northbound ramp to Oakland/Forbes Avenue closed. In effect through Nov. 11. Also, intermittent closures of one southbound lane weekdays from 9 a.m. to 3 p.m. through mid-November.

East Ohio Street, North Side -- Around-the-clock single-lane restriction of East Street from the Parkway North off-ramp to East Ohio through mid-November. East Street will be restricted to one 12-foot lane and Madison Avenue restricted to one 11-foot lane.

Advertise with us

Freeport Road, Harmar -- Single-lane traffic in area of Hulton Bridge through Oct. 19.

South Fayette -- Alpine Road, between Route 50 and Hickory Grade Road, closed through 7 a.m., Oct. 18.

Lafever Hill Road, Indiana Township -- Closed for bridge replacement at Little Deer Creek until early November.

Bull Creek Road, Fawn -- Closed for bridge replacement at Bull Creek until late October.

Bower Hill Road, Scott --  Paving between Vanadium Road and Painters Run Road, weekdays from 7 a.m. to 6 p.m. Traffic will be reduced to a single lane in each direction.