Route 51 in the South Hills will have lane restrictions today and throughout the weekend.
Inbound traffic will be reduced to one lane from 9 a.m. to 3 p.m. today from Stewart Avenue to Fairhaven Road, with no outbound restrictions in that area during that time.
Single-lane traffic will be in effect in both directions from 7 p.m. today to 7 p.m. Sunday between Lebanon Church Road and Mullooly Street and between Bausman Street and Overbrook Boulevard.
Ongoing restrictions announced previously by PennDOT are an outbound lane closure from Overbrook Boulevard to Maytide Street from 7 a.m. to 3 p.m. weekdays through Oct. 2; and intermittent overnight restrictions starting at 10 p.m. through Wednesday between the Elizabeth Bridge and the Westmoreland County line and between Coal Valley and Lebanon Church roads.
The Parkway West will be closed outbound from the Fort Pitt Bridge to I-79 (including the tunnel) from 9 p.m. today to 2 p.m. Sunday. Inbound traffic will be restricted to one lane from 9 p.m. today to noon on Saturday and 9 p.m. Saturday to 9 a.m. Sunday.
Next week, the outbound side will be closed starting at 10 p.m. Monday through Thursday from the Fort Pitt Bridge to I-79 and inbound restrictions in various locations will start at 9 a.m. All restrictions wrap by 6 a.m. daily.
The Pennsylvania Turnpike has announced a closure of the eastbound side from Butler Valley to Allegheny Valley from 12:01 a.m. to 5:30 a.m. on Sunday. Traffic will be detoured via Route 8, Route 910 and Freeport Road.
A section of the Port Authority’s Red Line will be closed in both directions from 6 a.m. to 6 p.m. Saturday. Trains will detour to the Blue Line between South Hills Junction and Overbrook Junction. Red Line stops from Overbrook Junction to Potomac will be served by rail shuttles. Buses will operate between Potomac and South Hills Junction.
Reminder: PennDOT recommends that in approaching lane-restricted work zones, motorists slow down, and if traffic is backed up, use all open lanes to the merge point, then take turns.
Restrictions this week:
Greentree Road, Scott -- Pavement patching will cause single-lane traffic from Manorview to Cochran roads from 7 p.m. today to 5 p.m. Saturday.
Parkway Center Drive, Green Tree -- Off-ramp from the outbound side of the Parkway West will remain closed around the clock through Sept. 28.
Parkway East -- Inspection of the ramp from the inbound side to the Boulevard of the Allies will close shoulders from 9 a.m. to 3 p.m. today.
Route 28 -- Lane restrictions today between the Highland Park Bridge and Harmar so crews can install new poles for closed-circuit traffic cameras. The single-lane, rolling closures will run from 7 a.m. to 5 p.m.
William Raymond Prom Memorial (31st Street) Bridge -- Single-lane alternating traffic from 10 p.m. to 6 a.m. through Sept. 26.
Fort Couch Road, Bethel Park -- Single-lane traffic possible in both directions at the bridge carrying the Light Rail Transit line over the road through Oct. 2.
Interstate 70 -- Eastbound lane restrictions in the vicinity of the south junction with I-79 from 8 p.m. today through 6 a.m. Monday; westbound from 8 p.m. Sept. 25 through 6 a.m. Sept. 28.
Pennsylvania Turnpike -- Traffic paces, during which state police will slow vehicles to 20 to 25 mph, will occur weekdays in both directions between Somerset and Bedford through March. The 20-minute paces will begin at noon on Mondays through Thursdays and 9:45 a.m. on Fridays.
Old Clairton Road, Pleasant Hills -- Work hours for reconstruction have been extended to 10 p.m. for this week. Restrictions to businesses and homeowners will in place during paving. Designated parking at Pleasant Hills Library, Pleasant Hills Middle School and Pleasant Hills Community Presbyterian Church while access to homes and businesses is cut off. Road closed to northbound traffic from Glenburn to Picture drive with single-lane traffic southbound.
Round Hill Road, Elizabeth Township -- Closed until late November during replacement of a bridge structure, about a half-mile east of Route 48. It is the second closure of the road this year; the first was to correct a slide.
Ongoing traffic restrictions:
Lacock Street, North Side -- Closed till late September between Federal and Sandusky streets.
Streets Run Road, Baldwin Township -- Closed near Brentwood Road for bridge replacement. Completion expected mid-November.
Brightwood Road, Bethel Park -- Paving causing lane closures with flaggers directing traffic from 7 a.m. to 6 p.m. weekdays through late September.
Saxonburg Boulevard, O’Hara -- Closed between Calmwood Road and Brownshill Road for culvert replacement. Completion scheduled for late October.
Monongahela Wharf -- Paving to alter entry/exit patterns through beginning of October.
Liberty Bridge -- Single-lane restrictions will occur as needed daily on the bridge through Oct. 2, on the following schedule: 10 tonight through 5 a.m. Friday; Mondays through Fridays from 10 a.m. to 2 p.m.; from 8 p.m. Fridays to noon on Saturdays; from 6 p.m. Saturdays to noon on Sundays; and from 6 p.m. Sundays to 5 a.m. Mondays.
Monongahela Incline -- Closed through late November. Shuttle buses provided. Lower station service is provided at the Station Square bus shelter.
Baum Boulevard-North Craig Street-Bigelow Boulevard, North Oakland and Bloomfield -- Baum closed to westbound traffic at Melwood Avenue through late November. Eastbound traffic in single lane. Bloomfield Bridge closed to northbound traffic through late September.
Penn Avenue, Point Breeze -- Lane restrictions daily from 9 a.m. to 4 p.m. from Fifth to Dallas avenues and Braddock to Homewood avenues through Oct. 1.
Fall Run Road, Shaler -- Closed indefinitely between Maple Street and Middle Road. Those who live along the roadway will be able to access their homes from Middle Road.
Route 51 West Carson Street -- Closed to outbound traffic. Estimated completion June 2016.
Route 51/88 intersection, Overbrook -- Northbound Route 88 closed, no access to Route 51 through late November.
Route 8, Hampton -- Northbound lane closed between Clearview Road and Murray Avenue through mid-December. Duncan Avenue closed between Route 8 and Grand Avenue through late October.
Route 50, South Fayette -- Single-lane traffic using westbound side in work zone from Washington County line to Millers Run Road through late October.
McKnight Road, McCandless -- Single-lane traffic using southbound lanes between Pine Creek and West Arcadia roads until further notice.
Birmingham Bridge -- Northbound side closed with traffic will be shifted to southbound lanes, with one northbound lane and two southbound lanes open. Northbound ramp to Oakland/Forbes Avenue closed. In effect through Nov. 11. Also, intermittent closures of one southbound lane weekdays from 9 a.m. to 3 p.m. through mid-November.
East Ohio Street, North Side -- Around-the-clock single-lane restriction of East Street from the Parkway North off-ramp to East Ohio through mid-November. East Street will be restricted to one 12-foot lane and Madison Avenue restricted to one 11-foot lane.
Route 286-Golden Mile Highway, Monroeville -- Single-lane traffic in work zone between Route 22 and Old Frankstown Road until further notice.
Freeport Road, Harmar -- Single-lane traffic in area of Hulton Bridge through Oct. 19.
Lafever Hill Road, Indiana Township -- Closed for bridge replacement at Little Deer Creek until early November.
Bull Creek Road, Fawn -- Closed for bridge replacement at Bull Creek until late October.
Future restrictions:
Liberty Tunnels -- Inbound tunnel to close overnight starting at 10 p.m. Monday through Thursday. Reopens by 5:30 a.m. daily.
Armstrong Tunnels -- Closed inbound starting at 10 p.m. Monday, Thursday and Friday. Reopening by 6 a.m.
Squirrel Hill Tunnels -- Maintenance and washing to limit traffic to one lane in both directions starting at 10 p.m. Sunday through Friday, with work concluding by 5 a.m. daily.
Route 28, North Side -- Overnight lane closures possible in both directions between the Prom Memorial (31st Street) Bridge and the North Shore ramp starting at 8 p.m. Monday through Sept. 28. Restrictions end by 5 a.m. on weekdays and 8 a.m. on weekends.
Route 30, East suburbs -- Lane restrictions possible during pavement reflector replacement from 9 a.m. to 3 p.m. Monday through Thursday from the Parkway East to the Westmoreland County line.
Homestead-Duquesne Road, Munhall -- To close at 9 a.m. on Monday for slope stabilization project at the Franklin Bend near Vondera Street. Completion expected mid-December.
Hulton Bridge -- Scheduled to close from Oct. 5 to Oct. 19 for roadway realignment to new bridge. Traffic will be shifted to the new structure after the closure with opening scheduled for Oct. 20. Intermittent stoppages and lane closures in the area of the bridge are possible from 8 a.m. to 4 p.m. Monday through Friday.
Interstate 80, Mercer County -- Pavement restoration will begin on 15 miles extending eastward from the Ohio line on Sept. 28, causing lane closures at times through November 2016.
Route 88 in Ginger Hill, Washington County -- Closed between Ginger Hill Road and Patterson Road beginning Monday through late October.
Philadelphia area -- No construction projects planned for Pope Francis’ visit to the city Sept. 22 through Sept. 27. Also, key traffic routes in Delaware County, Montgomery County and Bucks County leading into city will be limited. Traffic information available at www.papal511.com.
Jon Schmitz: jschmitz@post-gazette.com.
Follow @pgtraffic




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.