Parkway West restrictions resume tonight.
The inbound side of the Parkway West will close at 9 tonight through Thursday from Interstate 79 to the Fort Pitt Bridge, including the tunnel.
The outbound side will have lane closures at various locations after 9 p.m. tonight and Wednesday and starting an hour after the end of the Pirates game Thursday. Restrictions lift by 6 a.m. daily.
Reminder: PennDOT recommends that in approaching lane-restricted work zones, motorists slow down, and if traffic is backed up, use all open lanes to the merge point, then take turns.
Restrictions this week:
Monongahela Incline -- Closed starting today for construction. Reopening planned for late November. Shuttle buses provided.
Monongahela Wharf --
Paving to alter entry/exit patterns starting today for about one month.
Route 51, Overbrook -- Outbound lane closed between Overbrook Boulevard and Maytide Street from 7 a.m. to 3 p.m. weekdays through Oct. 2.
Liberty Bridge -- Single-lane restrictions will occur as needed daily on the bridge through Oct. 2, on the following schedule: Mondays through Fridays from 10 a.m. to 2 p.m.; from 8 p.m. Fridays to noon on Saturdays; from 6 p.m. Saturdays to noon on Sundays; and from 6 p.m. Sundays to 5 a.m. Mondays.
Route 28, Tarentum -- Left inbound lane closed between the Tarentum-New Kensington exit and the Bakerstown Road overpass from 9 a.m. to 3 p.m. today through Thursday (Sept. 8-10).
Brightwood Road, Bethel Park -- Paving begins today causing lane closures with flaggers directing traffic from 7 a.m. to 6 p.m. weekdays through late September.
Ongoing traffic restrictions:
Lacock Street, North Side -- Closed till late September between Federal and Sandusky streets.
Laketon Road, Penn Hills and Wilkinsburg -- Milling and paving to occur from 6 a.m. to 4 p.m. through Sept. 16.
Baum Boulevard-North Craig Street-Bigelow Boulevard, North Oakland and Bloomfield -- Baum closed to westbound traffic at Melwood Avenue through late November. Eastbound traffic in single lane. Bloomfield Bridge closed to northbound traffic through late September.
Penn Avenue, Point Breeze -- Lane restrictions daily from 9 a.m. to 4 p.m. from Fifth to Dallas avenues and Braddock to Homewood avenues through Oct. 1. No work on Labor Day.
Route 51 West Carson Street -- Closed to outbound traffic. Estimated completion June 2016.
Route 51/88 intersection, Overbrook -- Northbound Route 88 closed, no access to Route 51 through late November.
Route 8, Hampton -- Northbound lane closed between Clearview Road and Murray Avenue through mid-December. Duncan Avenue closed between Route 8 and Grand Avenue through late October.
Route 50, South Fayette -- Single-lane traffic using westbound side in work zone from Washington County line to Millers Run Road through late October.
McKnight Road, McCandless -- Single-lane traffic using southbound lanes between Pine Creek and West Arcadia roads through mid-September.
Birmingham Bridge -- Northbound side closed with traffic will be shifted to southbound lanes, with one northbound lane and two southbound lanes open. Northbound ramp to Oakland/Forbes Avenue closed. In effect through Nov. 11. Also, intermittent closures of one southbound lane weekdays from 9 a.m. to 3 p.m. through mid-November.
East Ohio Street, North Side -- Around-the-clock single-lane restriction of East Street from the Parkway North off-ramp to East Ohio through mid-November. East Street will be restricted to one 12-foot lane and Madison Avenue restricted to one 11-foot lane.
Route 286-Golden Mile Highway, Monroeville -- Single-lane traffic in work zone between Route 22 and Old Frankstown Road through mid-September.
Freeport Road, Harmar -- Single-lane traffic in area of Hulton Bridge through Oct. 19.
Lafever Hill Road, Indiana Township -- Closed for bridge replacement at Little Deer Creek until early November.
Bull Creek Road, Fawn -- Closed for bridge replacement at Bull Creek until late October.
Future restrictions:
Saxonburg Boulevard, O’Hara -- To close Wednesday between Calmwood Road and Brownshill Road for culvert replacement. Completion scheduled for late October.
Streets Run Road, Baldwin Township -- To close Wednesday near Brentwood Road for bridge replacement. Completion expected mid-November.
Philadelphia area -- No construction projects planned for Pope Francis’ visit to the city Sept. 22 through Sept. 27. Also, key traffic routes in Delaware County, Montgomery County and Bucks County leading into city will be limited.
Port Authority schedule changes -- Effective Sunday, schedules will change on 36 bus routes, including extensions of four routes to the Groveton section of Robinson, North Baldwin Borough, Penn State-Allegheny campus in McKeesport and RIDC Park in O’Hara.
Jon Schmitz: jschmitz@post-gazette.com.
Follow @pgtraffic




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.