Be your own traffic reporter! Visit www.511pa.com for views from nearly 150 PennDOT traffic cameras.
Note: Restrictions listed below are scheduled for the current week (Oct. 23 to 29) unless otherwise noted.
On the parkways
East -- Single-lane traffic outbound between Monroeville off-ramp and Pennsylvania Turnpike from 8 p.m. Friday to 6 a.m. Monday during paving. Outbound off-ramp to Plum and northbound Route 48 closed. Single-lane traffic outbound at bridge over Business Route 22 in Monroeville nightly starting at 8 p.m. Mondays through Fridays, 10 p.m. Saturdays and 7 p.m. Sundays, concluding by 5 a.m. weekdays, 9 a.m. Saturdays and 10 a.m. Sundays, through Dec. 16.
North -- Right lane closed outbound between Mazeroski Way and Anderson Street from 9 a.m. to 2 p.m. Wednesday, Thursday, Monday Oct. 31 and Tuesday Nov. 1 during inspection.
West -- Lane closures possible in both directions near the Carnegie interchange starting at 10 p.m. Sunday Oct. 30 through Thursday Nov. 3 and concluding by 6 a.m. daily during washing of overhead ramp.
On the interstates
79, Bridgeville, Collier -- Reduced to one lane in both directions from Washington County line to half-mile north of Bridgeville interchange from 7 p.m. Monday through Thursday until 6 a.m. the next day, except that one-lane pattern in three-lane section begins at 9 p.m. Single-lane traffic also in effect from 7 p.m. Friday to 7 p.m. Saturday. Two-lane traffic in work zone with 45 mph speed limit at other times. Ramp from eastbound Millers Run Road to northbound I-79 at Bridgeville interchange closed for extended construction.
79, Butler County -- Closed northbound at Evans City (Exit 83) from 11 p.m. Saturday to 5 a.m. Sunday for overhead sign installation. Detour via Routes 528, 19 and 488 to on-ramp at Portersville (Exit 96).
79, Marshall -- Single-lane traffic in both directions in the area between Cranberry (Exit 78) and Wexford (Exit 73) from 7 p.m. Friday through approximately 5 p.m. Saturday during milling and resurfacing. Significant delays likely. Motorists should consider alternate routes. Same restrictions will occur weekend og Nov. 4-5. At other times, reduced to two lanes in both directions near Warrendale-Bayne Road (Exit 75), through mid-November.
79, Washington County-- Construction under way at Meadow Lands interchange, with on- and off-ramps closed and new traffic patterns in effect including lane closures at night. Manifold Road and Pike Street-Locust Avenue closed in work zone.
579, Downtown -- Bridges carrying Seventh Avenue over I-579 to Washington Place and from Sixth Avenue/Chatham Square over I-579 to Bedford Avenue closed through mid-November.
In the city
Becks Run Road, South Side, Baldwin Borough -- One-way traffic outbound from East Carson Street to Wagner Avenue through early November. Inbound traffic must turn left at Wagner.
Chateau Street, North Side -- Ramp to northbound Route 65 closed around-the-clock through late November. Traffic will take ramp to California Avenue to bypass closed ramp and access northbound Route 65.
Ellsworth Avenue, Shadyside -- Closed from Spahr Street to Lamont Place through late November for construction of pedestrian bridge.
Greenfield Avenue, Greenfield -- Closures and restrictions possible between Ronald and McCaslin streets through early November for water line work.
Liberty Bridge -- Overnight lane closures possible after 9 p.m. weeknights through Nov. 11 during bridge washing.
Liberty Tunnels -- Single-lane traffic outbound Monday and Thursday nights (Oct. 31 and Nov. 3), inbound Tuesday and Wednesday nights, (Nov. 1-2) from 10 p.m. to 5 a.m. during inspection and cleaning.
Route 19-West Liberty Avenue, Beechview and Brookline -- Night and weekend restrictions possible between Wenzell and Pioneer avenues during ongoing reconstruction.
Route 28, North Side, Millvale -- Southbound bypass lanes at 40th Street Bridge closed at 8 p.m. Mondays through Thursdays during installation of light poles and fencing on new retaining wall. Southbound traffic will use left lane and pass through 40th Street Bridge intersection. Bypass lanes will reopen at 5 a.m. daily. Restriction in place through Oct. 31. At other times, two lanes open southbound, one lane northbound through construction zone; no access to or from 31st Street Bridge; no northbound access to 40th Street Bridge; Rialto Street intersection closed. Major project to continue into 2014.
Route 65, North Side -- Closed to all traffic in both directions at the Marshall Avenue interchange through midsummer. Traffic to detour via off- and on-ramps. Ramp from Marshall Avenue and California Avenue to southbound Route 65 closed through mid-November using Beaver Avenue to detour. Ramp will remain open to Beaver Avenue. Southbound ramp to California Avenue closed at 6 a.m. Wednesday through late October during painting of bridges over the ramp.
Route 885, Hays -- Single-lane traffic in both directions at bridge over Baldwin Road through December.
West Carson Street, West End -- Lane closures possible between the West End Bridge and Stanhope Street from 9 a.m. to 3 p.m. Wednesday and Thursday during survey for future repaving project.
Wood Street, Boulevard of Allies, Downtown -- Streetscape project at Point Park University has closed sidewalk and curb lane on west side of Wood between Fort Pitt Boulevard and First Avenue. Sidewalk and lane blocked on outbound Allies at intersection.
East
Avonmore Bridge, Westmoreland County -- Closed until Oct. 31 for deck repairs, crack sealing, mortar pointing, guiderail replacement and painting.
Business Route 22, Monroeville -- Lane closures and brief traffic stoppages possible in area under outbound Parkway East from 8 p.m. to 6 a.m. nightly through Dec. 16. Westbound traffic reduced to alternating one-way pattern with intermittent traffic stoppages of up to five minutes or less eastbound.
Rodi Road, Penn Hills -- Alternating one-way traffic possible from Frankstown Road to McCrady Road between the Parkway East and Business Route 22 from 9 p.m. to 5 a.m. weeknights through late October during repaving.
Route 22, Monroeville -- Westbound lane and shoulder closures possible from 9 a.m. to 3 p.m. weekdays through early November between Old William Penn Highway and Elliott Road during installation of guide rail, message board and traffic camera.
Tri-Boro Expressway, Wilmerding, Turtle Creek -- Single-lane traffic eastbound from Monroeville Avenue to Patton Street from 8 a.m. to 4 p.m. weekdays through Nov. 7 during geotechnical work for future wall repairs.
William Penn Highway, Churchill-- Single-lane traffic in both directions between Route 130 (Beulah Road) and the ramp to the inbound Parkway East/Old Gate Road while slide repairs are completed.
North
Babcock Boulevard, McCandless -- Reduced to one lane in both directions between Wildwood and Pearce Mill roads during trail project to continue into winter. Further restrictions possible overnight starting at 7 p.m. Tuesday, Wednesday and Thursday during repaving.
Butler Logan Road, Frazer -- Closed between Yutes Run Road and Log Cabin Road by landslide below the roadway until further notice.
McKnight Road, McCandless, Ross -- Ramp from Babcock Boulevard to southbound McKnight Road closed, with traffic detoured south on Babcock Boulevard to Peebles Road to Evergreen Road to southbound McKnight Road; traffic shifted on bridge over Babcock Boulevard with continuing single-lane restrictions; nightly single lane closures from Nelson Run Road to Perrymont Road continue overnight starting at 8 p.m. northbound and 9 p.m. southbound, with traffic restored by 6 a.m. weekdays and 8 a.m. weekends; single-lane closures on Babcock Boulevard in the area of McKnight from 6 p.m. Monday through Friday to 6 a.m. the next day. Work to continue until mid-November.
Pearce Mill Road, Pine -- Closed for repair of slide between Route 910 and Pennsylvania Turnpike overpass until late November.
Route 8, Richland -- Lane closures in both directions between Route 910 and the Butler County line starting at 7 p.m. Sundays through Thursdays until 5 a.m. the next day; 8 p.m. Fridays to 8 a.m. Saturdays; and 8 p.m. Saturdays to 10 a.m. Sundays, through mid-November.
Route 19, Pine and McCandless -- Single-lane traffic in both directions in Wexford Flats area between Old Perry Highway and Brooktree Road through November.
Route 65, Avalon -- Reduced to one lane in each direction for rehabilitation of bridge over Birmingham Avenue through late November.
Route 65, Emsworth -- Single-lane traffic at Lowries Run Bridge through fall. Turning lane to Camp Horne Road closed through late November but access to Camp Horne Road is maintained.
Stanton Avenue/Hoffman Road, Millvale, Reserve -- Closed between Karen Drive in Millvale and Johnston Street in Reserve through the end of October for culvert replacement.
Thompson Run Road, Ross -- Closed to through traffic just south of Amity Road through November for bridge replacement. Local access preserved and southbound drivers can turn left onto Amity.
South
Boston Bridge, Versailles, Elizabeth Township -- Overnight closures canceled Thursday and Friday. Alternating one-way traffic from 9 a.m. to 3 p.m. those days and next Monday through Friday, Oct. 31-Nov. 4. Bridge open and unrestricted this weekend. No overnight closures next week.
Boyce Road, Upper St. Clair -- Alternating one-way traffic possible between Morton Road and Route 19 from 9 a.m. to 3 p.m. weekdays Thursday through Nov. 10 for shoulder work.
Brownsville Road, Broughton Road, South Park, Pleasant Hills -- Brownsville reduced to a single 11-foot-wide lane in each direction between Sixth Street and Philippe Drive. Both lanes on Broughton restricted to 11-foot-wide lanes. Eastbound traffic on Brownsville not able to make left turns onto Fifth Street and Philippe Drive. Traffic on southbound Brownsville and Fifth Street and eastbound Philippe only able to make right turns onto Brownsville. Left-turn access to Curry Hollow Road closed, through summer. No left turn from northbound Curry Hollow to Brownsville. Major reconstruction project continues through spring 2013.
Clairton-Glassport Bridge -- Traffic limited to single 11-foot wide lane in each direction through late October.
Coal Valley Road No. 1, Clairton -- Closed between Routes 885 and 837 through late October for culvert replacement and drainage work.
McLaughlin Run Road, Bridgeville -- Closed to thru traffic between Maple Street and Ridge Road for bridge replacement until late October or early November.
McMurray Road, Bethel Park and Upper St. Clair -- Alternating one-way traffic possible between Route 19 and Hays Road during replacement of gas lines from 8 a.m. to 4 p.m. daily through November.
Round Hill Road, Elizabeth Township -- Closed to through traffic between Scenery Drive (Route 48) and Simpson Howell Road through the end of November during replacement of culvert bridge. Three-mile detour via Scenery Drive, Peairs Road and Simpson Howell Road.
Route 19, Washington County -- Single-lane traffic at bridge over Route 519 in North Strabane until late fall.
Route 148, North Versailles, East McKeesport -- Traffic has been shifted to newly constructed southbound lanes. Single-lane traffic will continue between Westinghouse Avenue and Route 30 through early December.
West
Ewing Road, Moon -- On- and off-ramps at southbound Business 376 closed through Monday, Oct. 31, for construction of roundabout. Traffic maintained on Ewing Road.
Pittsburgh International Airport -- Periodic traffic stoppages of up to 10 minutes possible on entrance roads during reconstruction work until mid-November.
Presto-Sygan Road, South Fayette -- Alternating one-way traffic in slide area between Oakridge and Millers Run roads until further notice.
Route 22, North Fayette -- Short-term lane closures possible eastbound between the Route 978 Imperial and Hankey Farms interchanges from 7 a.m. to 7 p.m. weekdays Wednesday through Nov. 21. Some Saturday work also possible.
Route 50, Bridgeville to Carnegie -- Weeknight and weekend lane restrictions possible from Bower Hill Road to Boden Avenue during concrete patching, inlet and curb work and repaving.
Route 65, Beaver County -- Single-lane traffic in both directions from Allegheny County line to Route 18 during resurfacing around the clock through early 2012.
Spring Run Road Extension, Moon -- Closed from Boggs School Road to North Flaugherty Run Road for replacement of Boggs Run Bridge through May.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.