Be your own traffic reporter! Visit www.511pa.com for views from nearly 150 PennDOT traffic cameras.

Note: Restrictions listed below are scheduled for the current week (Oct. 9 to 15) unless otherwise noted.

On the parkways

East -- Off-ramp at Plum (Exit 84B) closed overnight at 8 p.m. daily with reopening at 5 a.m. weekdays and 10 a.m. on weekends, through Monday, during pavement work.

Advertise with us

West -- Restricted to two narrow lanes in both directions at bridge over Campbells Run Road in Robinson with 45 mph speed limit through late November, with single-lane traffic restrictions possible overnight during bridge rehabilitation.

Fort Pitt Tunnels -- One outbound lane closed overnight starting at 10 p.m. Tuesday and Wednesday; one inbound lane closed overnight starting at 10 p.m. Thursday, during cleaning. Lanes reopen at 5 a.m.

On the interstates

79, Bridgeville, Collier -- Reduced to one lane in both directions from Washington County line to half-mile north of Bridgeville interchange from 7 p.m. Friday to 8 a.m. Sunday. One-lane pattern also in effect after 7 p.m. weekdays until 6 a.m. the next day. Two-lane traffic in work zone with 45 mph speed limit at other times. Ramp from eastbound Millers Run Road to northbound I-79 at Bridgeville interchange closed for extended construction.

79, Marshall -- Reduced to two lanes in both directions near Warrendale-Bayne Road (Exit 75), through mid-November.

Advertise with us

79, Washington County-- Construction under way at Meadow Lands interchange, with on- and off-ramps closed and new traffic patterns in effect including lane closures at night. Manifold Road and Pike Street-Locust Avenue closed in work zone.

579, Downtown -- Bridges carrying Seventh Avenue over I-579 to Washington Place and from Sixth Avenue/Chatham Square over I-579 to Bedford Avenue closed through mid-November. Westbound Centre Avenue from Washington Place to Sixth Avenue closed for work on bridge over I-579 through Tuesday.

In the city

Becks Run Road, South Side, Baldwin Borough -- One-way traffic outbound from East Carson Street to Wagner Avenue through early November. Inbound traffic must turn left at Wagner.

Chateau Street, North Side -- Ramp to northbound Route 65 closed around-the-clock through late November. Traffic will take ramp to California Avenue to bypass closed ramp and access northbound Route 65.

Advertise with us

Ellsworth Avenue, Shadyside -- Closed from Spahr Street to Lamont Place through late November for construction of pedestrian bridge.

Liberty Bridge -- Overnight lane closures possible after 9 p.m. weeknights through Nov. 11 during bridge washing.

Liberty Tunnels -- No additional closures planned at this time.

Route 19-West Liberty Avenue, Beechview and Brookline -- Paving to continue weeknights through Friday, with all traffic moved to single lanes on one side between Wenzell and Pioneer avenues. Lane restrictions continue daily from 9 a.m. to 3 p.m. as needed.

Route 28, North Side, Millvale -- Southbound bypass lanes at 40th Street Bridge closed at 8 p.m. Mondays through Thursdays during installation of light poles and fencing on new retaining wall. Southbound traffic will use left lane and pass through 40th Street Bridge intersection. Bypass lanes will reopen at 5 a.m. daily. Restriction in place through Oct. 31. At other times, two lanes open southbound, one lane northbound through construction zone; no access to or from 31st Street Bridge; no northbound access to 40th Street Bridge; Rialto Street intersection closed. Major project to continue into 2014.

Advertise with us

Route 65, North Side -- Closed to all traffic in both directions at the Marshall Avenue interchange through mid-November. Traffic to detour via off- and on-ramps. Ramp from Marshall Avenue and California Avenue to southbound Route 65 closed through mid-November using Beaver Avenue to detour. Ramp will remain open to Beaver Avenue. Southbound ramp to California Avenue closed at 6 a.m. Wednesday through late October during painting of bridges over the ramp.

Route 885, Hays -- Single-lane traffic in both directions at bridge over Baldwin Road through December.

Wood Street, Boulevard of Allies, Downtown -- Streetscape project at Point Park University has closed sidewalk and curb lane on west side of Wood between Fort Pitt Boulevard and First Avenue. Sidewalk and lane blocked on outbound Allies at intersection.

East

Avonmore Bridge, Westmoreland County -- Closed until Oct. 31 for deck repairs, crack sealing, mortar pointing, guiderail replacement and painting.

Advertise with us

Brown Avenue, Wilkins -- Alternating one-way traffic possible between Washington Avenue and Russell Road weekdays from 7 a.m. to 3 p.m. during wall repairs through Oct. 17. No weekend work.

Hulton Bridge -- Alternating one-way traffic possible from 9 a.m. to 2 p.m. weekdays through Friday during inspection. Local police to assist with traffic control and restrictions lifted in event of excessive delays.

Rodi Road, Penn Hills -- Alternating one-way traffic possible from Frankstown Road to McCrady Road between the Parkway East and Business Route 22 from 9 p.m. to 5 a.m. weeknights through late October during repaving.

Route 22, Monroeville -- Westbound lane and shoulder closures possible from 9 a.m. to 3 p.m. weekdays through early November between Old William Penn Highway and Elliott Road during installation of guide rail, message board and traffic camera.

William Penn Highway, Churchill-- Single-lane traffic in both directions between Route 130 (Beulah Road) and the ramp to the inbound Parkway East/Old Gate Road while slide repairs are completed.

Advertise with us

North

Babcock Boulevard, McCandless -- Reduced to one lane in both directions between Wildwood and Pearce Mill roads during trail project to continue into winter.

Butler Logan Road, Frazer -- Closed between Yutes Run Road and Log Cabin Road by landslide below the roadway until further notice.

McKnight Road, McCandless, Ross -- Lane restrictions on bridge over Babcock Boulevard and nightly lane closures from Babcock to Perrymont Road continue into November. Single lane closures on Babcock in the area of McKnight Road will continue on weeknights starting at 6 p.m. Paving to cause restrictions on weekday nights through mid-October.

Pearce Mill Road, Pine -- Closed for repair of slide between Route 910 and Pennsylvania Turnpike overpass until late November.

Advertise with us

Route 8, Richland -- Lane closures in both directions between Route 910 and the Butler County line starting at 7 p.m. Sundays through Thursdays until 5 a.m. the next day; 8 p.m. Fridays to 8 a.m. Saturdays; and 8 p.m. Saturdays to 10 a.m. Sundays, through mid-November.

Route 19, Pine and McCandless -- Single-lane traffic in both directions in Wexford Flats area between Old Perry Highway and Brooktree Road through November.

Route 65, Avalon -- Reduced to one lane in each direction for rehabilitation of bridge over Birmingham Avenue through late November.

Route 65, Emsworth -- Single-lane traffic at Lowries Run Bridge through fall. Turning lane to Camp Horne Road closed through late November but access to Camp Horne Road is maintained.

Route 910, Pine -- Alternating one-way traffic during resurfacing of 1.3 miles from Windgate Drive to Church Road starting at 7 p.m. Monday through Friday and concluding by 6 a.m.

Advertise with us

Stanton Avenue/Hoffman Road, Millvale, Reserve -- Closed between Karen Drive in Millvale and Johnston Street in Reserve through the end of October for culvert replacement.

Thompson Run Road, Ross -- Closed to through traffic just south of Amity Road through November for bridge replacement. Local access preserved and southbound drivers can turn left onto Amity.

South

Boston Bridge, Versailles, Elizabeth Township -- Closed from 7 p.m. Friday to 5 a.m. Sunday. Long-term around-the-clock closure has ended. Restrictions to continue at various times until mid-December. Sidewalk open to pedestrians.

Brownsville Road, Broughton Road, South Park, Pleasant Hills -- Brownsville reduced to a single 11-foot-wide lane in each direction between Sixth Street and Philippe Drive. Both lanes on Broughton restricted to 11-foot-wide lanes. Eastbound traffic on Brownsville not able to make left turns onto Fifth Street and Philippe Drive. Traffic on southbound Brownsville and Fifth Street and eastbound Philippe only able to make right turns onto Brownsville. Left-turn access to Curry Hollow Road closed, through summer. No left turn from northbound Curry Hollow to Brownsville. Major reconstruction project continues through spring 2013.

Advertise with us

Clairton-Glassport Bridge -- Traffic limited to single 11-foot wide lane in each direction through late October.

Coal Valley Road No. 1, Clairton -- Closed between Routes 885 and 837 through late October for culvert replacement and drainage work.

McLaughlin Run Road, Bridgeville -- Closed to thru traffic between Maple Street and Ridge Road for bridge replacement until late October or early November.

McMurray Road, Bethel Park and Upper St. Clair -- Alternating one-way traffic possible between Route 19 and Hays Road during replacement of gas lines from 8 a.m. to 4 p.m. daily through November.

Round Hill Road, Elizabeth Township -- Closed to through traffic between Scenery Drive (Route 48) and Simpson Howell Road from 6 a.m. Tuesday through the end of November during replacement of culvert bridge. Three-mile detour via Scenery Drive, Peairs Road and Simpson Howell Road.

Advertise with us

Route 19, Washington County -- Single-lane traffic at bridge over Route 519 in North Strabane until late fall.

Route 51, Rostraver -- Lane restrictions at bridge over I-70 at various times between 8 p.m. and 7 a.m. Sunday evenings through Friday mornings. Lane closures also possible on I-70. No work between 7 a.m. Fridays and 8 p.m. Sundays. Project will continue into October.

Route 148, North Versailles, East McKeesport -- Traffic has been shifted to newly constructed southbound lanes. Single-lane traffic will continue between Westinghouse Avenue and Route 30 through early December.

West

Ewing Road, Moon -- On- and off-ramps at southbound Business 376 closed through late October for construction of roundabout. Traffic maintained on Ewing Road.

Advertise with us

Pittsburgh International Airport -- Periodic traffic stoppages of up to 10 minutes possible on entrance roads during reconstruction work until mid-November.

Presto-Sygan Road, South Fayette -- Alternating one-way traffic in slide area between Oakridge and Millers Run roads until further notice.

Route 22, North Fayette -- Eastbound traffic reduced to single lane at Hankey Farms through mid-October. Ramp from eastbound Route 30 to westbound Route 22 at Imperial closed through mid-October for reconstruction. Lane closures in area of Tonidale interchange as needed from 9 a.m. to 3 p.m. weekdays through Oct. 21. Saturday restrictions may also occur if needed from 7 a.m. to 3 p.m.

Route 30, North Fayette -- Eastbound ramp to westbound Route 22 at Imperial interchange closed for reconstruction through mid-October.

Route 50, Bridgeville to Carnegie -- Restricted to one lane in both directions from Bower Hill Road to Boden Avenue from 8 p.m. Friday to 6 a.m. Monday, Oct. 17 during concrete patching, inlet and curb work and repaving.

Advertise with us

Route 65, Beaver County -- Single-lane traffic in both directions from Allegheny County line to Route 18 during resurfacing around the clock through early 2012.

Spring Run Road Extension, Moon -- Closed from Boggs School Road to North Flaugherty Run Road for replacement of Boggs Run Bridge through May.