Be your own traffic reporter! Visit www.511pa.com for views from nearly 150 PennDOT traffic cameras.
Note: Restrictions listed below are scheduled for the current week (Sept. 25 to Oct. 1) unless otherwise noted.
On the parkways
East -- Starting Thursday, off-ramp at Plum (Exit 84B) closed overnight at 8 p.m. daily with reopening at 5 a.m. weekdays and 10 a.m. on weekends, through Oct. 10, during pavement work.
West -- Restricted to two narrow lanes in both directions at bridge over Campbells Run Road in Robinson with 45 mph speed limit through late November, with single-lane traffic restrictions possible overnight during bridge rehabilitation.
On the interstates
79, Bridgeville, Collier -- Restricted to one lane in both directions from Washington County line to about one-half mile north of Bridgeville interchange starting at 7 p.m. Monday through Thursday and concluding by 6 a.m. with same restrictions also in place from 7 p.m. Friday to 11 a.m. Sunday.
79, Marshall -- Reduced to two lanes in both directions near Warrendale-Bayne Road (Exit 75), through mid-November.
79, Washington County-- Construction under way at Meadow Lands interchange, with on- and off-ramps closed and new traffic patterns in effect including lane closures at night. Manifold Road and Pike Street-Locust Avenue closed in work zone.
579, Downtown -- Southbound ramp to Liberty Bridge closed overnight starting at 8 p.m. Monday through Thursday, reopening by 6 a.m., during replacement of bearings. Bridges carrying Seventh Avenue over I-579 to Washington Place and from Sixth Avenue/Chatham Square over I-579 to Bedford Avenue closed through mid-October. Westbound Centre Avenue from Washington Place to Sixth Avenue closed for work on bridge over I-579 through Oct. 11.
In the city
Becks Run Road, South Side, Baldwin Borough -- One-way traffic outbound from East Carson Street to Wagner Avenue through late September. Inbound traffic must turn left at Wagner.
Chateau Street, North Side -- Ramp to northbound Route 65 closed around-the-clock through late November. Traffic will take ramp to California Avenue to bypass closed ramp and access northbound Route 65.
Ellsworth Avenue, Shadyside -- Closed from Spahr Street to Lamont Place through late November for construction of pedestrian bridge.
Liberty Tunnels -- Tunnels closed nightly at 10 p.m. Sundays through Thursdays, reopening at 6 a.m., through early October.
Rachel Carson Bridge, Downtown -- Closed from noon to 3 p.m. Thursday during filming.
Route 8, Highland Park -- Alternating one-way traffic on bridge over Heth's Run between One Wild Place and Gallitan Street near the Pittsburgh Zoo parking area from 9 a.m. to 2 p.m. Monday during resurfacing.
Route 19-West Liberty Avenue, Beechview and Brookline -- Single-lane traffic around-the-clock in both directions as reconstruction continues in various zones between Wenzell and Pioneer avenues through November.
Route 28, North Side, Millvale -- Inbound traffic restricted to single narrow lane from 8 p.m. to 5 a.m. weeknights between the 40th Street Bridge and the Chestnut Street overpass through Oct. 14. At other times, two lanes open southbound, one lane northbound through construction zone; no access to or from 31st Street Bridge; no northbound access to 40th Street Bridge; Rialto Street intersection closed. Major project to continue into 2014.
Route 65, North Side -- Closed to all traffic in both directions at the Marshall Avenue interchange through mid-November. Traffic to detour via off- and on-ramps. Ramp from Marshall Avenue and California Avenue to southbound Route 65 closed through mid-November using Beaver Avenue to detour. Ramp will remain open to Beaver Avenue.
Route 885, Hays -- Single-lane traffic in both directions at bridge over Baldwin Road through December.
Wood Street, Boulevard of Allies, Downtown -- Streetscape project at Point Park University has closed sidewalk and curb lane on west side of Wood between Fort Pitt Boulevard and First Avenue. Sidewalk and lane blocked on outbound Allies at intersection.
East
Avonmore Bridge, Westmoreland County -- Closed until Oct. 31 for deck repairs, crack sealing, mortar pointing, guiderail replacement and painting.
Hulton Bridge -- Alternating one-way traffic possible from 9 a.m. to 2 p.m. weekdays through Oct. 14 during inspection. Local police to assist with traffic control and restrictions lifted in event of excessive delays.
Rodi Road, Penn Hills -- Alternating one-way traffic possible from Frankstown Road to McCrady Road between the Parkway East and Business Route 22 from 9 p.m. to 5 a.m. weeknights through late October during repaving.
William Penn Highway, Churchill-- Single-lane traffic in both directions between Route 130 (Beulah Road) and the ramp to the inbound Parkway East/Old Gate Road while slide repairs are completed.
North
Babcock Boulevard, McCandless -- Reduced to one lane in both directions between Wildwood and Pearce Mill roads during trail project to continue into winter.
Butler Logan Road, Frazer -- Closed between Yutes Run Road and Log Cabin Road by landslide below the roadway until further notice.
Freeport Road, 10th Avenue, Brackenridge, Harrison -- Lane closures and restrictions possible from Sycamore Street to Olive Avenue from 7 a.m. to 5 p.m. and overnight after 6 p.m. weekdays through September for milling, resurfacing and other improvements.
McKnight Road, McCandless, Ross -- Southbound jug-handle to Nelson Run Road closed from 8 p.m. Friday through 6 a.m. Monday for milling and resurfacing. Northbound ramp to Babcock Boulevard closed through Oct. 3. Lane restrictions on bridge over Babcock Boulevard and nightly lane closures from Babcock to Perrymont Road will continue into early October. Single lane closures on Babcock in the area of McKnight Road will continue on weeknights starting at 6 p.m.
Pearce Mill Road, Pine -- Closed for repair of slide between Route 910 and Pennsylvania Turnpike overpass until late November.
Route 8, Richland -- Lane closures in both directions between Route 910 and the Butler County line starting at 7 p.m. Sundays through Thursdays until 5 a.m. the next day; 8 p.m. Fridays to 8 a.m. Saturdays; and 8 p.m. Saturdays to 10 a.m. Sundays, through mid-November.
Route 19, Pine and McCandless -- Single-lane traffic in both directions in Wexford Flats area between Old Perry Highway and Brooktree Road through November.
Route 28, Sharpsburg -- Lane closures on southbound bridge over Kittanning Pike from 9 a.m. to 3 p.m. Monday during inspection.
Route 65, Avalon -- Reduced to one lane in each direction for rehabilitation of bridge over Birmingham Avenue through late November.
Route 65, Emsworth -- Single-lane traffic at Lowries Run Bridge through fall.
Stanton Avenue/Hoffman Road, Millvale, Reserve -- Closed between Karen Drive in Millvale and Johnston Street in Reserve through the end of October for culvert replacement.
Thompson Run Road, Ross -- Closed to through traffic just south of Amity Road through November for bridge replacement. Local access preserved and southbound drivers can turn left onto Amity.
South
Boston Bridge, Versailles, Elizabeth Township -- Long-term around-the-clock closure continues through Oct. 10. After that, restrictions to continue at various times until mid-December. Sidewalk open to pedestrians.
Brownsville Road, Broughton Road, South Park, Pleasant Hills -- Brownsville reduced to a single 11-foot-wide lane in each direction between Sixth Street and Philippe Drive. Both lanes on Broughton restricted to 11-foot-wide lanes. Eastbound traffic on Brownsville not able to make left turns onto Fifth Street and Philippe Drive. Traffic on southbound Brownsville and Fifth Street and eastbound Philippe only able to make right turns onto Brownsville. Left-turn access to Curry Hollow Road closed, through summer. No left turn from northbound Curry Hollow to Brownsville. Major reconstruction project continues through spring 2013.
Clairton-Glassport Bridge -- Traffic limited to single 11-foot wide lane in each direction through late October.
Coal Valley Road No. 1, Clairton -- Closed between Routes 885 and 837 through late October for culvert replacement and drainage work.
McLaughlin Run Road, Bridgeville -- Closed to thru traffic between Maple Street and Ridge Road through late September for bridge replacement.
McMurray Road, Bethel Park and Upper St. Clair -- Alternating one-way traffic possible between Route 19 and Hays Road during replacement of gas lines from 8 a.m. to 4 p.m. daily through November.
Route 19, Washington County -- Single-lane traffic at bridge over Route 519 in North Strabane until late fall.
Route 51, Rostraver -- Lane restrictions at bridge over I-70 at various times between 8 p.m. and 7 a.m. Sunday evenings through Friday mornings. Lane closures also possible on I-70. No work between 7 a.m. Fridays and 8 p.m. Sundays. Project will continue into October.
Route 148, North Versailles, East McKeesport -- Single-lane traffic in both directions from just south of Westinghouse Avenue to Route 30 through early December for major reconstruction and bridge replacement project that eventually will extend to Hartman Street in McKeesport.
West
Ewing Road, Moon -- On- and off-ramps at southbound Business 376 closed through late October for construction of roundabout. Traffic maintained on Ewing Road.
Montour Church Road, North Fayette -- Bridge over Route 22/30 at the Tonidale interchange closed through late September for replacement.
Pittsburgh International Airport -- Periodic traffic stoppages of up to 10 minutes possible on entrance roads during reconstruction work until mid-November.
Presto-Sygan Road, South Fayette -- Closed for water line relocation in slide area between Oakridge and Millers Run roads through Nov. 11.
Route 22, North Fayette --These ramps at Hankey Farms interchange to close from 6 p.m. today through 6 a.m. Friday, then again from 6 p.m. Friday through 6 a.m. Monday for milling and resurfacing: eastbound Route 22 to Oakdale Road; Oakdale Road to eastbound Route 22; westbound Route 22 to Oakdale Road.
Route 22, North Fayette -- Project to lengthen acceleration and deceleration lanes at interchanges at Route 978-Imperial and Hankey Farms causes single-lane traffic eastbound through both interchanges and on-ramp traffic required to stop before merging. Restrictions in place through Friday. Westbound traffic reduced to single lane at the Hankey Farms and Imperial interchanges around-the-clock through mid-October. Ramp from eastbound Route 30 to westbound Route 22 at Imperial closed through mid-October for reconstruction. Lane closures in area of Tonidale interchange as needed from 9 a.m. to 3 p.m. weekdays through Oct. 21. Saturday restrictions may also occur if needed from 7 a.m. to 3 p.m.
Route 30, North Fayette -- Eastbound ramp to westbound Route 22 at Imperial interchange closed for reconstruction through mid-October.
Route 50, Bridgeville --Reduced to a single lane from Bower Hill Road in Bridgeville to Boden Avenue in Carnegie from 8 p.m. Friday to 6 a.m. Monday for concrete patching, adjusting and rebuilding inlets and replacing curbs. Short-term lane closures possible from 9 a.m. to 3 p.m. weekdays. Overnight resurfacing makes lane closures possible from 8 p.m. to 6 a.m. Monday through Thursday nights and from 8 p.m. to 8 a.m. Friday and Saturday nights. Work progressing east toward Carnegie.
Route 65, Beaver County -- Single-lane traffic in both directions from Allegheny County line to Route 18 during resurfacing around the clock through early 2012.
Spring Run Road Extension, Moon -- Closed from Boggs School Road to North Flaugherty Run Road for replacement of Boggs Run Bridge through May.



Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.