Although it may not be the perfect pool, North Fayette's Hankey Farms swimming pool on Old Steubenville Pike was a popular attraction during the recent wave of 90-degree days.
A record-breaking 585 swimmers cooled down there on July 5 -- a sign that the pool is in demand, parks and recreation director Bob Brozovich said.
"It shows that people will use the facility if we have it," he said. "Build it and they will come."
A study of the 50-year-old swimming pool has concluded it should be either renovated or replaced.
"I would love to see either option adopted," Mr. Brozovich said. "Not only has the population here exploded, but the pool industry has changed too."
Supervisors this month received the final report on a swimming pool feasibility study, completed by the consulting firm Aquatic Facility Design Inc., of Millersburg, Dauphin County.
The report recommends either renovating the pool complex for $1.7 million or building a new, indoor facility for $3 to $5 million.
"It's a big decision. It's extremely big," the supervisors' chairman, James Morosetti, said. "We'll be hashing it over, there's no doubt about it. But my particular view, I can't see a brand new pool."
The high cost of either option may mean that until the money is available, the township will continue to focus on maintaining the pool and making it as nice as possible for families, Mr. Morosetti said.
The report details a $1.7 million renovation plan that would expand capacity from 249 to 379 patrons and enlarge the main pool and wading pool by about a third each.
The plan would add amenities such as water toys and a children's splash pad; replace the plumbing, heating, filtration and sanitation systems; construct a new bathhouse and changing area; reconfigure the concession stand and expand the food selection; convert the current restrooms to a lifeguard station; and make all facilities compliant with the Americans with Disabilities Act.
The improvements would attract more patrons, allow more programming, generate more revenue for the township and solve code and accessibility issues, the report said.
"A contemporary aquatics complex will provide access and activities for all age groups and activity levels," the report saids. "The goal of this complex is to provide equal opportunities for educational, social and recreational types of programs."
The ability to expand the facility is limited because it's landlocked on about five acres in the Hankey Farms neighborhood.
Building a new, indoor aquatics complex on a larger lot would increase capacity to 972 people but cost an estimated $3 million to $5 million -- not including the land purchase or an optional $1.5 million outdoor pool for 585 users, the report said.
The two-year, $23,500 pool study included public feedback, financial evaluations and interviews with township staff and recreation groups. It was funded by a grant from the state Department of Conservation and Natural Resources.
The swimming pool complex was built in the early 1960s as part of the Hankey Farms housing plan. The report says the complex needs to be renovated to overcome usability issues and modernized to suit public uses, expectations and trends.
"It's not just a one-housing-plan community anymore, and that's basically what that pool was built for," Mr. Brozovich said. "I think [a better pool] would add a lot to the community and quality of life."




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.