For 95 years, teachers at St. Joseph High School in the Natrona Heights section of Harrison gathered at water fountains or in stairwells because they had no faculty lounge. Students were bused to a YMCA for once-a-week gym class, and the champion basketball teams practiced at five public schools for lack of a gym.

Every nook and alcove became a makeshift laboratory where award-winning science and engineering students rigged robots and juggled Petri dishes.

But not anymore.

When the school bell rings next Thursday, St. Joseph will welcome students and faculty into a 65,000-plus-square-foot, $9 million facility featuring a college quality gymnasium and a state-of-the-art science and technology center. Even the robots will have a playground.

Advertise with us

"Our kids are so appreciative, because they know what it is like to be without," said Kate Barkowski, 25, of Monroeville, the school's building project manager and athletic administrator.

Building funds came entirely from private monetary and in-kind donations from alumni, parishioners, community members and businesses.

"The expansion idea has been there forever," Ms. Barkowski said. "Planning began 13 years ago, and active fund-raising began two years ago. Everyone knows this is necessary to ensure our future."

The current building will still house nonscience classes.

In the spring the school, desperate for space, opened the Walter Dlubak Athletic Center before it was completed and two years after breaking ground.

Advertise with us

The Science and Technology Center broke ground in February and will be ready for the first day of school. "It was a 11/2-year project, pounded into six months," Ms. Barkowski said.

Enrollment, at about 190 students, was so far beyond capacity that the students were using 11 rented classrooms at Our Lady of Most Blessed Sacrament Parish, rooms in the parish rectory, nearby offices and gymnasiums and cafeterias in surrounding public school districts.

"Before this, the students were in the halls and we were stepping on kids and robots," or students built projects at home, she said. Now, not only will students have computer workstations to design their robots, workshops to cut robot parts and mobile workstations for assembly, but the 'bots will actually have a "robot playground" in the first floor lobby to roam and show off their "ro-bilities," Ms. Barkowski said.

The hallways boast flat-screen televisions and wireless connections, and have benches and areas where students can congregate and study. All floors, except science lab floors, are made of donated maple and bamboo. A multipurpose room, one of the most anticipated areas, has screens, projectors and an audio system, and it will host community lectures, Masses for students and a place for drama productions and the students' award-winning history displays. A patio provides a space for students to congregate outside, outdoor biology classes and even alumni reunions, said Ms. Barkowski.

Cathy Greco, a biology, chemistry and genetics teacher, is excited about the opportunities the building holds for her students. Chemicals will be stored nearby in a classroom storage room rather than the basement, and students working on independent research projects will have a project room.

Advertise with us

"Until now, we put things on window sills and in an overcrowded lab," said Mrs. Greco, of New Kensington. "We designed the new labs to be multipurpose and adaptable, and a lot of the equipment is portable."

"It will be fun to watch the students go into the new lab," she added. "They walked into the gym like they were walking into a church. They couldn't believe they were there."

The builder, Volpatt Construction Corp., "has been completely on board with what we are doing," Ms. Barkowski said. "Every square foot of space of the facilities was thought out and designed to be multifunctional, green and low maintenance."

For example, the gym floor uses one-third less wood than regular gym floors, and the wood comes from a sustainable forest in Germany. It is polyurethane-free and won't need refinishing for at least 10 years, she said.

"Special foam underneath allows the wood to slightly depress when the athletes run on it, which is healthier for adolescent legs," Ms. Barkowski said.

Advertise with us

In lieu of traditional sand and cinder block, the construction blocks, all donated, are made of recycled materials including glass beads. In addition to "green" roofs with water flow control, the facilities use energy- and water-efficient heating and air-conditioning systems. All lighting is on sensors and uses energy-efficient bulbs. The gym has ultraviolet sensors so that lights will turn off on bright days.

In the athletic complex, a 60- by 10-foot glass window allows visitors in the gym's VIP room to observe games in style. The room also is being used for meetings and receptions.

"We never had locker rooms, because we didn't have a gym. The cheerleaders changed under the bleachers," Ms. Barkowski said with a laugh. "It took one of my coaches a month to realize he could leave the basketballs in his gym and not the trunk of his car."

The enrollment at St. Joseph on Montana Street increased from 135 to its present level in the past seven years, Ms. Barkowski said.

According to Ms. Barkowski, St. Joseph's tuition is $6,750, while the cost to educate each student is up to $9,000. She said the difference is made up by donations from the community so that almost every student receives financial aid. "Our families make great sacrifices for the kids to come here."