An observation deck that is part of the $3 million sculpture of children's television icon Fred Rogers has been reduced in size because of concerns about the dimensions of the project.
Officials with the Astorino design firm told Pittsburgh Art Commission members yesterday that they have cut the depth of the platform from 66 feet to just under 59 feet to accommodate concerns of the city-Allegheny County Sports & Exhibition Authority.
In a letter, the authority, which owns the North Shore riverfront park where the sculpture would be placed, said it had concerns about "the mass and scale" of the project.
Authority Executive Director Mary Conturo wrote that the park master plan showed a steel platform that was about 1,287 square feet and extended only six feet from the edge of an abutment toward the river, while the actual sculpture design featured a 4,925-square-foot platform that extended 25 feet.
With the reduction, the platform still measures 4,390 square feet, but Astorino officials believe that will pass muster with the authority. They said they can't reduce it more in part because of accessibility requirements.
Ms. Conturo could not be reached for comment yesterday.
Also at yesterday's meeting, Tom Sokolowski, director of The Andy Warhol Museum on the North Side, panned the sculpture, saying it was "wrongheaded" and made "ill use" of the Manchester Bridge pier.
"To me the piece looks like a float from the Tournament of Roses parade collided with a cement truck," he said.
Frank Dawson of Astorino responded: "We think this is a great piece. We think it should be in a location of prominence. We like the idea that it's a constant reminder that we have children and that they're important in our lives."
The sculpture, designed by the same sculptor who did the Mayor Richard Caliguiri statue on Grant Street, would be placed on the observation deck, which would be bored into the bridge pier. A keyhole shape would be cut out of the pier to offer views of the Point.
The Art Commission has given preliminary approval to the project. A final vote is expected later this fall.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.