A storm Monday that dropped 22 inches of snow on Sugarloaf Mountain in Maine was accompanied by high winds that prompted the resort on Tuesday to place several lifts on "wind hold," including the Spillway East double chairlift.

After the winds abated, the Spillway lift was opened to the public. Shortly afterward, a sharp-eyed ski patroller riding the chair noticed the wire cable to which its chairs were attached was running toward the outside of the sheave train on Tower 8. The sheave train are the wheels that support the cable as it travels over the tower.

Two chairlift mechanics were sent out. The mechanic who climbed Tower 8 wasn't able to realign the cable so it would settle back into the correct position on the sheaves. He said the lift should be shut down.

When that happens, a lift is operated at "crawl" speed so passengers can get off at the top.

Advertise with us

Moments after the Spillway lift was restarted, the cable slipped off Tower 8 and five chairs fell about 30 feet into the new snow. The 35-year-old lift, tentatively scheduled to be replaced next summer, was stopped and locked in position.

Six persons were hurt, but none had life-threatening injuries. The ski patrol treated them and sent them to Franklin Memorial Hospital in Farmington, Maine.

Three were transferred to the Maine Medical Center in Portland. Two more persons later checked into Franklin Memorial on their own.

More than 50 resort personnel helped to evacuate approximately 150 persons on the lift, using a sling seat and a rope and belay system. It took about 90 minutes.

"Everyone did a great job," said Sugarloaf spokesman Ethan Austin. "The ski patrol trains a ton to handle situations like this."

Advertise with us

Austin said each Sugarloaf lift receives routine daily inspections for safety. They also undergo weekly, monthly and annual maintenance and testing.

The accident is being investigated by the Maine Board of Elevator and Tramway Safety. The board, which is being assisted by resort employees and engineering consultants, believes the high winds may have been a contributing factor to the accident.

On Feb. 17, 1988, the wire cable on the Avalanche chairlift at Seven Springs suddenly sagged and the lift stopped.

No one fell and there were no injuries. The ski patrol got everyone down safely.

On Jan. 28, 2009, Seven Springs closed the mountain because of icy conditions.

Advertise with us

Spokeswoman Anna Weltz said resort personnel perform daily, weekly, monthly, annual and year-round maintenance and testing on all chairlifts and surface lifts.

"We check for points of wear, cracks, stress, replace cables or move chairs [to new positions on the cables] as a preventative measure," she said. "Each [lift] also is closely inspected by the state Department of Labor and Industry."

Her comments were echoed by her counterparts at other major resorts -- Lori Epp at Wisp, Md., Laura Parquette at Snowshoe, W.Va., and Jane Eshbaugh at Holiday Valley, N.Y..

But what about older lifts?

"As with any kind of machinery, the age is not as significant as the maintenance," Eshbaugh said. "We are careful to follow maintenance schedules ... and the procedures required by state and manufacturer's specifications and the American National Safety Institute. Several of our lifts have had major upgrades since installation."

Advertise with us

Parquette said Snowshoe shut down two lifts Monday because of high winds.

"[That's] standard practice when we think it wouldn't be safe to operate them," Parquette said.

More on lifts next week.

For more information on Sugarloaf, go to www.sugarloaf.com.