Martha Rial, Post-Gazette
This is just a sample of the damage Montour Run did to the Montour Trail when rains generated by Hurricane Ivan caused Mpntour Run to overflow its banks and run rampant over, around and under everything in its path. The Montour Trail Council, which has been able to reopen some sections of the trail, has posted 15 photos of the damage on its Web site: www.montourtrail.org.
Click photo for larger image.
It will take a lot of money, time and effort for the Montour Trail Council to gets its heavily-eroded trail back in shape from the scouring it took from the rains of Hurricane Ivan, but the can-do council and its neighboring communities have made a start.
Mile 0 to Hassam Road (Mile 1.4) has re-opened, but use Montour Road for the first 0.2 mile. The council praised Moon Township for rebuilding Montour Road a few days after Montour Run overflowed its banks and ran rampant over the road and the bike trail. Some sections of both were under five feet of water.
The Cliff Mine Trailhead (Mile 6) to Enlow (Mile 7.6) also has re-opened, but the trail may be rough in some sections.
The Enlow (Mile 7.6) to North Star Road (Mile 9.5) section of the trail has re-opened. Again, there may be some rough spots. Bicyclists are urged to use the trailheads at Enlow Field (Mile 7.6) or Boggs Road (Mile 11.4).
The council said its engineers estimate it will take $475,000 to repair the first 6.5 miles of the trail. Another $100,000 is needed for fencing and signs.
The Allegheny Regional Asset District last week approved the council's request to use a $25,000 grant it obtained last year for flood repairs. The money, originally intended for a parking lot project, will be used to buy fill, crushed limestone and other materials to repair a section of the trail between Montour Run Road in Moon and Cliff Mine Road in Findlay.
Council President Dennis Pfeiffer said the materials will be used to fill holes and rebuild sections that were washed away.
Gerald "Jere" Comber visited the Montour Trail Friday morning and sent an e-mail update.
"I just came back from checking out conditions and the repair work they have done is amazing," Comber wrote. "All the small bridges across the creek have been cleaned and the ramp up to the bike trail has been rebuilt. The Montour Trail people do a terrific job and deserve our support."
Volunteers willing to help clean up the flood damage are asked to send their names, addresses and availability and any special skills, such as the ability to operate heavy equipment, to montourtrailhelp@yahoo.com. You also can call 412-257-3011. Saturday work parties have been scheduled for this month and next month.
Donations can be made on-line by using PayPal. Checks made out to the Montour Trail Council can be sent to the council at 304 Hickman Street, Bridgeville, Pa., 15017. Write "Flood Repair Fund" on the memo line.
To see the devastation Ivan did to the trail, go to www.montourtrail.org, click on Flood Info Page and call up any one of the 15 photographs.
Designer drilling
Drilling operations are scheduled to begin tomorrow on the Eliza Furnace Trail between Bates and Swinburne streets as part of the design studies for the extension of the Hot Metal Bridge to the trail.
The Urban Redevelopment Authority said the trail will remain open while the drilling work is being done. The authority said the work will continue through the end of the month.
The Hot Metal Bridge, a former railroad bridge that shares the same name and stone piers that support the adjacent vehicular bridge, will be converted for bicyclists and pedestrians. It will connect with a 94-foot long approach span that will lead to a 137-foot long bike-pedestrian bridge that will cross over Second Avenue.
Construction is expected to begin next summer.
Short but scenic
The Allegheny National Forest "Fall Colors" Bicycle Ride, a 6 mile round-trip ride with scenic views in the proposed Lamentation Run National Recreation Area, will begin at 10 a.m. Saturday at the turnaround of the northern end of Forest Road 212, Kingsley Township, Forest County.
The ride, organized by the Allegheny Defense Project, promises "exceptional views, beautiful forest lands and a basic introduction to the Lamentation Area." It will be the first "official ride" on the proposed Lamentation Run Bicycle Trail, a roads-to-trails effort led by the Allegheny Defense Project.
Ryan Talbott, a forest watch coordinator for the project, said the ride will end at the Stony Point overlook and its "stunning views of the beautiful Tionesta Creek Valley" and the town of Kellettville. "Come prepared for rain or shine, and bring water and your bicycle," Talbott said.
For more information, call 1-814-223-4996 or sign up on-line at www.alleghenydefense.org.
This story was originally published with images that are no longer available.




Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.