Travelers driving between Pittsburgh and Washington, D.C. have for years faced a somewhat maddening detour at the Breezewood Interchange — a curious stretch of gas stations, souvenir shops and traffic lights in the middle of two interstate highways.
That could change soon.
The Pennsylvania Turnpike Commission announced Tuesday that it is accepting proposals for a redesign of the interchange that would include an added connection to Interstate 70 — which could eliminate the need to pass through Breezewood.
The commission is accepting statements of interest from engineering firms hoping to spearhead the project from now until Oct. 17. It is seeking redesign plans that include a total reconstruction of the three-mile stretch between mileposts 160 and 163 on the interchange in order to reduce congestion and travel times.
They are also looking for proposals that feature a widening of the Pennsylvania Turnpike, building on a Commission Initiative started in 2004 to expand roadways to six lanes.
“We are proud to continue supporting the Commonwealth with safe and accessible roadways that serve as a catalyst for potential economic development,” Pennsylvania Turnpike Commission CEO Mark Compton said in the statement Tuesday.
Read More
“We believe the redesign of the Breezewood Interchange can provide more convenient access for Pennsylvania residents and visitors.”
While the Breezewood Interchange is a bane to some travelers, it's become a popular stopping point for others. Once called the “Las Vegas of roadside strips,” chain fast food spots, gift shops and gas stations abound on the stretch and have long propped up Breezewood’s economy. Nixing the mandatory drive through the town could hurt business owners.
The Commission is communicating with local stakeholders and seeking proposals that accommodate “a range of movements” — including giving travelers the option to continue passing through Breezewood, Pennsylvania Turnpike Commission Press Secretary Marissa Orbanek said.
According to Ms. Orbanek, engineering firms will be required to perform an alternative analysis study to determine how their plans will impact the surrounding community.
On average, projects take eight to 10 years from seeking a designer to beginning construction, the Commission said.





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.