Some have lost power, telephone service or both. One had water flood his basement. And as they struggle to attract customers, merchants are still facing at least several more months of construction at their doorsteps on Forbes Avenue, Downtown.

Some of the affected business owners wonder whether their shops will survive.

“We’re trying to hang in there but it’s getting harder and harder,” said John Vazquez, president of You’re in Steeler Country, a local sports apparel retailer whose walls and racks are crammed with Pirates, Steelers and Penguins T-shirts, hats and tank tops.

His business and a handful of others on the south side of Forbes between Smithfield and Wood streets have reported that sales have plummeted since the city shut down the stretch last November for a massive reconstruction that includes new pavement, curbs, sidewalks, utilities and street lights.

Advertise with us

The work has forced pedestrians, particularly those walking from Smithfield to Wood, to zigzag their way through a dusty and noisy construction zone to reach the establishments, which include a hat store, two restaurants and a hair salon.

“It’s an eyesore. It’s like a war zone trying to walk through it,” said Angel Oliverio, manager of Penn Avenue Fish Company, who added that her weeknight dining business has fallen as a result of the construction.

Making matters worse, merchants have lost the parking spaces outside of their businesses that many customers used to make a quick stop to drop off or pick up shoes or to buy a hat.

“I’m struggling for business. It’s too slow. Every customer that comes here complains,” said Kevin Hu, owner of The Headgear at 312 Forbes.

When the city launched the project last fall, it stated the street would be closed for about eight months. But it now says that Forbes won’t reopen until the end of the year.

Advertise with us

Mr. Vazquez is not sure how much more he can take. He said he has lost at least half of his business. “It’s kind of rough,” he said.

Gabriel Fontana, owner of Gabriel Shoe Repair at 304 Forbes, said his business has dropped about 30 percent since the project started.

“It’s disgusting, really. People complain that they can’t park for a couple of minutes to drop off shoes,” he said from behind the counter of his shop, filled with the aroma of shoe polish.

But the loss of business has been only part of the woes he has faced.

Over the last few months, Mr. Fontana said he also lost electrical power to the shop for most of one day and had telephone service interrupted for more than two weeks.

Advertise with us

About two weeks ago, a quarter of an inch of water flooded the shoe repair shop basement. “It was disgusting. You couldn’t even walk,” Mr. Fontana said.

The electrical outage also affected You’re In Steeler Country and The Headgear, which also lost phone service for two days.

Ken Olup, project manager for Hill International, the contract administrator and construction inspector for the project, said the goal is to reopen the affected section of Forbes by the end of the year.

The work is taking longer than expected, he said, because the contractor ran into unexpected utility issues. The Forbes project is scheduled to end next spring with the reconstruction of the Smithfield intersection.

Mr. Olup didn’t know what caused the electrical outage but said the basement flood probably was the result of a severed water line. He said a phone line was cut because it was being run through an abandoned gas line and workers were unaware of it.

Advertise with us

At the Courthouse Tavern at 310 Forbes, owner Mark Depante can’t wait for the work to end. He said the project has been “killing us” and is particularly incensed about the delays.

“It just keeps getting pushed back and pushed back. There’s no end in sight. It’s been a struggle the whole time, and we get no help from the city.”

The only thing saving him has been the construction workers who eat at the restaurant. “Without them, I would have been out of business six months ago,” Mr. Depante said, adding they were very responsive when he lost phone and water service.

While some merchants are struggling to endure, Mr. Vazquez is counting on divine providence.

“We hope with the help of God and a dozen angels that we’ll be here in February when the whole street gets open,” he said.

Mark Belko: mbelko@post-gazette.com or 412-263-1262.