The Denis Theatre moved one giant step — and $490,000 — closer to starting construction later this year in anticipation of a 2017 reopening.
In March, the theater’s foundation announced it would receive $145,000 if it raised $290,000 by year’s end. It was a nail-biter that went down to the final hours of 2015.
“What was so important was that the community rallied and wanted to see this happen,” Dr. Betty Jo Hirschfield Louik, fundraising chair, said this week. “I think the community got excited that we were so close because we were at 96 percent two days before, and then we just kept going. We were announcing it as we were going.”
The light at the end of the tunnel, or auditorium, is visible but the appeals aren’t over.
“We have aspirations to begin construction in late summer or early fall, but we need to continue to have the same kind of strong responses with folks continuing to donate funds and to contribute to this wonderful cause,” board of directors chairman Alan Trivilino said.
“We are a very responsible board, so what we want to do is make sure that we have all of our financial and other ducks in a row before we start that construction.”
The theater in Mt. Lebanon has been closed since September 2004.
“It has great bones. It’s cleared out. When you walk through, it’s exciting because you can see the vision of the old theaters that are there — the walls that are up — but it’s basically been cleaned of whatever was there previously,” from chairs and curtains to fixtures, Dr. Hirschfield Louik says.
Turning a single-screen theater that opened in 1938 and later was carved into four unequal spaces, including a small, awkward auditorium down a ramp and up the back stairs, into a modern-day attraction is no easy task.
“What we’re doing now is taking a crumbled infrastructure and replacing virtually every aspect of it, state of the art. So, the heating, the ventilation, the air conditioning, the wiring, the water, the whole thing,” said Mr. Trivilino. “We need to make it accessible for all people and then as well having the new technologies for film, sound, audio, video.”
Plans call for two movie auditoriums, one with 200 seats and the other with 100 and flexible space for spoken-word or small ensembles, along with a separate multi-purpose space that can double as a screening, meeting, party or classroom. A lounge and lobby area will serve as a visual arts showcase, alleviating some of the demand for wall displays at nearby Mt. Lebanon Public Library.
The challenge not only unlocked the $145,000 but triggered an additional $25,000 from the Lawrence and Rebecca Stern Family Foundation operated by the Upper St. Clair couple.
It also secured naming rights for the theater’s ticket booth (Charlotte and Dave Stephenson), technology for the learning center (William and Joann Mehaffey) and the lounge (Virginia Nicklas). Those donors, who contributed a total of $165,000, are from Mt. Lebanon.
The Irene C Shea Charitable Foundation also donated $55,000 toward the challenge grant.
Organizers say the Denis plans to specialize in independent films and also could serve as a South Hills home for the area’s wealth of film festivals. They have looked to such venues as the County Theater in Doylestown, Bucks County, and the Bryn Mawr Film Institute, which grew out of the 1926 Seville Theater outside Philadelphia, for inspiration.
The planned resurrection of the Denis on Washington Road comes at a time when the box office hit a 2015 record but also when movie lovers stream films, wait for Netflix or Redbox or other avenues unimaginable in the era of Clark Gable.
“What the Denis Theatre will provide is a full experience. So, one can certainly cook dinner at home or one can go out to a restaurant. One can watch a movie by themselves and stream — and that’s perfectly fine — or you can have a range of experiences at the Denis Theatre, it could be that whole community group gathering opportunity,” Mr. Trivilino said.
“It could be social interaction, that combination of shopping, dining, viewing a film, staying for a post-film discussion group,” the board chair said.
Still to come are plans for the marquee along Washington Road. “It will be eye catching so as the 80,000 cars drive by on a regular basis, they’ll be able to see from the car,” Dr. Hirschfield Louik said. “We will be able to open up the front there, so people can see in, into the lounge, they’ll be able to see into the artwork, the attractive lighting.”
Movie editor Barbara Vancheri: bvancheri@post-gazette.com or 412-263-1632. Read her blog: www.post-gazette.com/madaboutmovies.





Comments
Welcome to Post-Gazette subscriber-only commenting community. Please review our community guidelines.